Construction of Flood Control Structure along Camiling River (Left Bank), Libueg-Bacabac Section (Package D), Sta. 0+249 - Sta. 0+525, Camiling, Tarlac
Construction of Flood Control Structure along Camiling River (Left Bank), Libueg-Bacabac Section (Package D), Sta. 0+249 - Sta. 0+525, Camiling, Tarlac is a DPWH-tracked public work in CAMILING (TARLAC), TARLAC, Region III. Reported contract value: ₱48,388,239.68. Status: Reported complete (DPWH). Contractor on record: A C SOLIVEN CONST & GEN MERCHANDISE. Figures trace to sumbong.