Flood Control and Drainage20PD0061

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP/CRIBWALL, SAINT JOSEPH VILLAGE, BAGUIO CITY

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP/CRIBWALL, SAINT JOSEPH VILLAGE, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱987,744.86. Status: Reported complete (DPWH). Contractor on record: ALEPHNORTH PEAK CONST AND DEVELOPMENT CO. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱897,950 · ALEPHNORTH PEAK CONST AND DEVELOPMENT CO

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-12-31 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Benguet

Based on the coordinates published with the DPWH record and NOAH file Benguet.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF RIPRAP/CRIBWALL, SAINT JOSEPH VILLAGE, BAGUIO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of flood control (box culvert) Phase 2 Purok 1-3, San Antonio Village, Baguio City
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Baguio City DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱897,949.87 · ALEPHNORTH PEAK CONST AND DEVELOPMENT CO

Award / contract ref: 20PD0061

Contractor

C

25 projects · ₱219.3M total · 0 flags

4. Implementation

Contract Amount

₱987,744.86

Progress

Reported complete (DPWH)

Start Date

October 25, 2020

Target End

January 27, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioSaint Joseph Village
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.