Municipality
Maitum
Maitum, Sarangani, Region XII (SOCCSKSARGEN). 1st income class. Population 46,120 (2024 POPCEN).
Data-quality note: 3 DPWH projects linked to Maitum have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.
PSGC 1208005000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Maitum
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
145 records · ₱3,304,073,401.98
4 placed at Maitum level itself; the rest in LGUs under it.
- Road Upgrading (Unpaved to Paved) of Maitum-Lake Sebu Road, K1774+095-K1775+500, Maitum, Sarangani₱146,247,861.49 · 2016 · medium confidence (project coordinates inside the barangay boundary)
- Road Upgrading (Unpaved to Paved) Along Maitum-Lake Sebu Road, K1778+020-K1781+280 (Chainage 11447-Chainage 4407), Brgy. Upo-Tuana Datu Section, Maitum, Sarangani₱144,749,934.82 · 2017 · medium confidence (project coordinates inside the barangay boundary)
- Road Upgrading (Unpaved to Paved) Along Maitum-Lake Sebu Road, K1781+280-K1784+180, Chainage4407-Chainage 4407 - Chainage 7307), Brgy.Upo-Tuana Datu Section, Maitum, Sarangani₱144,749,290.67 · 2017 · medium confidence (project coordinates inside the barangay boundary)
- Rehabilitation/ Reconstruction of Roads With Slips, Slope Collapse and Landslide Along Maitum - Lake Sebu Road,K1777+275 - K1777+426, K1777+446 - K1777+630, Maitum, Sarangani Province₱122,168,969.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Paving of Unpaved Road Maitum-Lake Sebu Road, K1784+180-K1786+425, K1768+352-K1768+507, Maitum, Sarangani₱104,331,146.34 · 2018 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Concrete Road-Concreting of Road, Nhw Malalag-Batian, Sta. 7+488-Sta. 9+660, Maitum, Sarangani₱104,219,870.57 · 2021 · medium confidence (project coordinates inside the barangay boundary)
How linked: 141 by project coordinates inside the barangay boundary; 3 by project title names the place; 1 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱173,657,743.43
- Municipality of Maitum, Sarangani₱173,657,743.43 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Maitum itself. This shows the province figure for Sarangani.
9,644 records · ₱32,396,850,025.20
9,637 placed at Sarangani level itself; the rest in LGUs under it.
- Sarangani₱32,396,850,025.20 · 9,637 awards · high confidence (area of delivery is this province only)
- Sarangani, South Cotabato₱51,907,257.72 · 4 awards · low confidence (area of delivery lists several provinces)
- Cotabato, Maguindanao, Sarangani, South Cotabato, Sultan Kudarat₱4,369,880.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Sarangani, Siquijor, Sorsogon, South Cotabato₱124,150.00 · 2 awards · low confidence (area of delivery lists several provinces)
How linked: 9,637 by area of delivery is this province only; 7 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
23 records · ₱56,500,000.00
3 placed at Maitum level itself; the rest in LGUs under it.
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction of One-Storey School Building₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of Level Ii Potable Water Supply System₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱2,500,000.00 · 2025 · high confidence (location columns in the DBM release)
- Construction of Health Station₱2,500,000.00 · 2025 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱2,500,000.00 · 2025 · high confidence (location columns in the DBM release)
How linked: 23 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
90 records · ₱1,769,653,000.00
61 placed at Maitum level itself; the rest in LGUs under it.
- Concreting of Road, Nhw Malalag-Batian, Maitum, Sarangani₱108,000,000.00 · 2021 · high confidence (GAA line text names the place)
- Malalag-Kiayap-Zion-Batian Road Leading to Zion-Batian Ecosites, Brgy. Bati-An, Maitum, Sarangani₱105,000,000.00 · 2020 · medium confidence (GAA line text names the place)
- Malalag-Kiayap-Zion-Batian Road Leading to Zion-Batian Ecosites, Brgy. Bati-An, Maitum, Sarangani₱105,000,000.00 · 2023 · medium confidence (GAA line text names the place)
- Construction of Kalaong River Control, Maitum, Sarangani₱100,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Sarangani - Sultan Kudarat Coastala Roads, K1774+279 - K1777+323, Maitum, Sarangani₱100,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Concreting of Road, Nhw Luan-Ticulab-Cafe, Maitum, Sarangani₱95,000,000.00 · 2021 · high confidence (GAA line text names the place)
How linked: 90 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Legacy Const Corp Formerly: Legacy ConstContractor: Legacy Const Corp Formerly: Legacy Const
- Contractor Concentration (Flood Control)J G Oranza ConstContractor: J G Oranza Const
- High Concurrent Workload for One ContractorHi-Tone Const & Development Corp FormerlyContractor: Hi-Tone Const & Development Corp Formerly
- High Concurrent Workload for One ContractorLegacy Const Corp Formerly: Legacy ConstContractor: Legacy Const Corp Formerly: Legacy Const
- Contractor Concentration (Flood Control)Abu ConstContractor: Abu Const
- Contractor Concentration (Flood Control)J G Oranza ConstContractor: J G Oranza Const
Contractors on linked DPWH projects
All 57 contractors on DPWH projects linked to Maitum and the LGUs under it. Click a column to sort.
| Legacy Const CORP Formerly: Legacy Const | 7 | ₱643,680,874.67 | 2 |
| Mfn Builders | 10 | ₱273,733,300.10 | 0 |
| Jdrc Const | 3 | ₱261,969,924.57 | 0 |
| Jargon Const | 5 | ₱219,470,587.29 | 0 |
| Vicente T Lao Const | 2 | ₱195,499,992.40 | 0 |
| Verguz Const | 10 | ₱132,054,857.47 | 0 |
| F H Gopiteo Const | 4 | ₱123,049,455.94 | 0 |
| Charifer Builders INC | 2 | ₱116,373,919.85 | 0 |
| Abu Const | 1 | ₱104,331,146.34 | 1 |
| J G Oranza Const | 2 | ₱97,017,435.74 | 2 |
| Freden Const | 6 | ₱90,756,651.75 | 0 |
| Jdrc Const & Supplies CORP | 1 | ₱86,849,785.36 | 0 |
| Shepperd Const And Supply | 8 | ₱80,897,071.26 | 0 |
| Better Work Const | 1 | ₱79,497,601.66 | 0 |
| Ashleyka Const And Supplies | 1 | ₱77,741,060.85 | 0 |
| Mj Tiongson Const Formerly: Mjt Builders | 3 | ₱74,180,441.02 | 0 |
| Vertical Builders | 2 | ₱62,815,878.58 | 0 |
| Escorr Builders And Traders INC | 5 | ₱61,564,585.63 | 0 |
| Hi-Tone Const & Development CORP Formerly | 1 | ₱48,999,139.07 | 1 |
| J H R Ent | 1 | ₱48,249,665.34 | 0 |
| Ab Vision Engineering Const | 2 | ₱45,708,200.88 | 0 |
| Dellosa Design Builders CORP Formerly:Dellosa Design-Build Services | 1 | ₱40,031,195.04 | 0 |
| Lhe Const | 1 | ₱29,399,936.06 | 0 |
| Dumalag Surveying And Engineering Services | 4 | ₱23,591,817.23 | 0 |
| Marcus Const | 3 | ₱22,531,429.85 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in Maitum (19)
- Bati-an · 7 DPWH projects
- Kalaneg · 8 DPWH projects
- Kalaong · 6 DPWH projects
- Kiambing · 2 DPWH projects
- Kiayap · 9 DPWH projects
- Mabay · 3 DPWH projects
- Maguling · 5 DPWH projects
- Malalag · 39 DPWH projects
- Mindupok · 5 DPWH projects
- New La Union · 1 DPWH projects
- Old Poblacion · 6 DPWH projects
- Pangi · 4 DPWH projects
- Pinol · 3 DPWH projects
- Sison · 5 DPWH projects
- Ticulab · 3 DPWH projects
- Tuanadatu · 3 DPWH projects
- Upo · 21 DPWH projects
- Wali · 4 DPWH projects
- Zion · 7 DPWH projects
QR codes for Maitum
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
