FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, STA. 3+377 - STA. 3+758 (UPSTREAM, LEFT SIDE AND RIGHT SIDE), NET LENGTH = 762.00 L.M., MASB
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG LUMBANG RIVER, STA. 3+377 - STA. 3+758 (UPSTREAM, LEFT SIDE AND RIGHT SIDE), NET LENGTH = 762.00 L.M., MASB is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱48,607,213.75. Status: Reported complete (DPWH). Contractor on record: SPRING STAR CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost