CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG BAGONGBONG RIVER (PHASE 3) PROTECTING BAGONGBONG BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, UPSTREAM (11.6116, 124.3887); DOWNSTREAM (11.6109, 124.3824), ALMERIA, PROVINCE OF BILIRAN
CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG BAGONGBONG RIVER (PHASE 3) PROTECTING BAGONGBONG BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, UPSTREAM (11.6116, 124.3887); DOWNSTREAM (11.6109, 124.3824), ALMERIA, PROVINCE OF BILIRAN is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱27,908,170.00. Status: Reported complete (DPWH). Contractor on record: B C CUERPO CONST CORP. Figures trace to dpwh.
Total Contract Cost