CONSTRUCTION OF BUSALI FLOOD CONTROL PROTECTING BUSALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, BILIRAN, BILIRAN. (124.44958°, 11.49262° - 124.45033°, 11.49303°)
CONSTRUCTION OF BUSALI FLOOD CONTROL PROTECTING BUSALI BRIDGE AND BILIRAN CIRCUMFERENTIAL ROAD, BILIRAN, BILIRAN. (124.44958°, 11.49262° - 124.45033°, 11.49303°) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱9,633,800.00. Status: Reported complete (DPWH). Contractor on record: L M BALTONADO CONST. Figures trace to dpwh.
Total Contract Cost

