Construction of Flood Control Structure, Bangiad Creek (Package 3), Taytay, Rizal
Construction of Flood Control Structure, Bangiad Creek (Package 3), Taytay, Rizal is a DPWH-tracked public work in TAYTAY (RIZAL), RIZAL, Region IV-A. Reported contract value: ₱29,399,971.73. Status: Reported complete (DPWH). Contractor on record: E L ANOLIN CONST. Figures trace to sumbong.
Total Contract Cost

