Rehabilitation / Major Repair of Flood Control Structure21FA0059

Repair/ Rehabilitation of Flood Control at Purok 4, San Jose, Malilipot, Albay Sta. 0+000.00 - Sta. 0+176.00

Repair/ Rehabilitation of Flood Control at Purok 4, San Jose, Malilipot, Albay Sta. 0+000.00 - Sta. 0+176.00 is a DPWH-tracked public work in ALBAY, Region V. Reported contract value: ₱5,003,525.00. Status: Reported complete (DPWH). Contractor on record: ROLCO CONST & DEVELOPMENT CORP FOR. Figures trace to sumbong.

ALBAY, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱11,243

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱74,106,000 · release to the district office, not itemized per project

    Possible match · score 0.82

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FA0059 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-09-05 → 2025-10-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱28,429 per linear m= 0.2x the Region V median (n=61)

Contract cost ₱5,003,525 ÷ 176 linear m read from the DPWH title (“Sta. 0+000.00 - Sta. 0+176.00”; station range length (Sta. a+b to c+d)). National percentile: 4. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Albay

Based on the coordinates published with the DPWH record and NOAH file Albay.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Repair/ Rehabilitation of Flood Control at Purok 4, San Jose, Malilipot, Albay Sta. 0+000.00 - Sta. 0+176.00

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱11,243,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation of Flood Control System, Purok 3, Quirangay, Camalig, Albay
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱74,106,000.00 · FY2021

Released to Laguna 1st District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0007579

₱14,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0014172

₱10,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0010291

₱5,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0011457

₱4,000,000.00 · FY2021

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱5,003,525.00

Progress

Reported complete (DPWH)

Start Date

March 21, 2022

Target End

August 5, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayMalilipotSan Jose
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →