Flood Control and Drainage20FL0038

REHABILITATION OF PAWEK BRIDGE FLOOD CONTROL STRUCTURE(UPSTREAM AND DOWNSTREAM OF PAWEK BRIDGE) BULA

REHABILITATION OF PAWEK BRIDGE FLOOD CONTROL STRUCTURE(UPSTREAM AND DOWNSTREAM OF PAWEK BRIDGE) BULA is a DPWH-tracked public work in Sorsogon 2nd DEO, Region V. Reported contract value: ₱24,500,000.00. Status: Reported complete (DPWH). Contractor on record: RAMARPLUS INC FORMERLY RAMAR ENT. Figures trace to dpwh.

Sorsogon 2nd DEO, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱25,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱23,266,881 · RAMARPLUS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-04 → 2025-04-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Sorsogon

Based on the coordinates published with the DPWH record and NOAH file Sorsogon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF PAWEK BRIDGE FLOOD CONTROL STRUCTURE(UPSTREAM AND DOWNSTREAM OF PAWEK BRIDGE) BULA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Pawek Bridge Flood Control Structure (Upstream and Downstream of Pawek Bridge), Bulan, Sorsogon
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Sorsogon 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20FL0038-Rehabilitation of Pawek Bridge Flood Cont

₱23,266,881.49 · RAMARPLUS

Contractor

B

82 projects · ₱5.8B total · 9 flags

4. Implementation

Contract Amount

₱24,500,000.00

Progress

Reported complete (DPWH)

Start Date

February 17, 2020

Target End

August 14, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “REHABILITATION OF PAWEK BRIDGE FLOOD CONTROL STRUCTURE(UPSTREAM AND DOWNSTREAM OF PAWEK BRIDGE) BULA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/94b9e0c6-491b-477a-9011-45539bad6f28

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonBulanSan Isidro
Storms whose wind field reached it
Nokaen 2026Fung-Wong 2025Fengshen 2025Bualoi 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.