Data-quality note: 12 DPWH projects linked to San Quintin have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.
PSGC 0105537000 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to San Quintin
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
120 records · ₱1,845,652,597.85
14 placed at San Quintin level itself; the rest in LGUs under it.
- Construction of Flood Control Structure Along Depalo River, San Quintin, Pangasinan (Package 1)₱93,603,226.33 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure Along Depalo River, San Quintin, Pangasinan (Package 2)₱93,603,046.02 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Road Widening-Tertiary Roads, San Nicolas-Natividad-San Quintin-Umingan-Guimba Road K0204+000 - K0205+177, K0210+000 - K0211+400, K0212+811 - K0213+813₱86,597,114.43 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Retrofitting/ Strengthening of Permanent Bridges, Depalo Br. 1(B00845lz) Along Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba Rd₱69,642,120.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction and Maintenance of Bridge Along National Roads, Widening of Permanent Bridges From 1 to 2 Lanes, Depalo Bridge 1 (B00845lz) Along San Nicolas-Natividad-San Quintin-Umingan-Guimba Road₱56,744,368.27 · 2016 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure Along Banila River, Brgy. Buenavista, Umingan, Pangasinan₱48,250,000.00 · 2019 · medium confidence (project coordinates inside the barangay boundary)
How linked: 106 by project coordinates inside the barangay boundary; 12 by project title names the place; 2 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱47,600,353.97
- Municipality of San Quintin, Pangasinan₱47,600,353.97 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to San Quintin itself. This shows the province figure for Pangasinan.
85,876 records · ₱215,301,232,064.48
85,835 placed at Pangasinan level itself; the rest in LGUs under it.
- Pangasinan₱215,301,232,064.48 · 85,835 awards · high confidence (area of delivery is this province only)
- Ilocos Norte, Ilocos Sur, La Union, Pangasinan₱32,735,719.44 · 12 awards · low confidence (area of delivery lists several provinces)
- Benguet, Ilocos Norte, Ilocos Sur, La Union, Pangasinan₱10,270,956.00 · 6 awards · low confidence (area of delivery lists several provinces)
- Benguet, Ilocos Norte, Ilocos Sur, La Union, Mountain Province, Pangasinan₱9,311,352.00 · 6 awards · low confidence (area of delivery lists several provinces)
- Aurora, Bulacan, Ilocos Sur, Marinduque, Nueva Vizcaya, Occidental Mindoro, Oriental Mindoro, Palawan, Pangasinan, Romblon₱7,941,750.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Aurora, Bataan, Cagayan, Ilocos Norte, Ilocos Sur, Isabela, La Union, Marinduque, Nueva Vizcaya, Occidental Mindoro, Oriental Mindoro, Palawan, Pangasinan, Quirino, Romblon, Zambales₱2,281,640.00 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 85,835 by area of delivery is this province only; 41 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
2 records · ₱10,000,000.00
- Construction of Water Supply System in Barangay Lumayao, San Quintin₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
How linked: 2 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
48 records · ₱675,440,000.00
34 placed at San Quintin level itself; the rest in LGUs under it.
- Construction of Flood Control Structure Along Dipalo River, Brgy. Bantog-Casantamarian, San Quintin, Pangasinan₱50,000,000.00 · 2019 · high confidence (GAA line text names the place)
- Construction (Completion) of Flood Control Structure (Package 1) Along Dipalo River, Barangay Bantog-Nangapugan, San Quintin, Pangasinan₱46,000,000.00 · 2021 · high confidence (GAA line text names the place)
- Construction (Completion) of Flood Control Structure (Package 2) Along Dipalo River, Barangay Bantog-Nangapugan, San Quintin, Pangasinan₱46,000,000.00 · 2021 · high confidence (GAA line text names the place)
- Access Road Leading to Depalo Falls, San Quintin, Pangasinan₱40,000,000.00 · 2018 · high confidence (GAA line text names the place)
- Construction of Road, Brgy. Lagasit-Bolintaguen-Cabalaoangan, San Quintin, Pangasinan₱30,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Access Road Leading to Depalo Falls, San Quintin, Pangasinan₱25,000,000.00 · 2020 · high confidence (GAA line text names the place)
How linked: 48 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- High Concurrent Workload for One ContractorSt Timothy Const CorpContractor: St Timothy Const Corp
- High Concurrent Workload for One ContractorNorthern BuildersContractor: Northern Builders
- Contractor Concentration (Flood Control)W J P Const and SupplyContractor: W J P Const and Supply
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 27 contractors on DPWH projects linked to San Quintin and the LGUs under it. Click a column to sort.
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in Pangasinan
BIR publishes collections by province and city, not by town or barangay. San Quintin is in Pangasinan.
₱8.05 billion
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities
Proposed for 2027: DPWH projects
8 line items worth ₱100.0M in the FY2027 National Expenditure Program (FY2026 NEP: 4 worth ₱285.0M). Counted from lines that name San Quintin.
- Rehabilitation of Road, Barangay Cabangaran - Barangay Casantamaria-an, Barangay Bantog - Barangay Alac, Barangay Zone 3, Barangay Casantamaria-an, Barangay Baligayan, San Quintin, PangasinanPangasinan 2nd District Engineering Office · NEP p.354₱50.0M
- Construction of Public Water Supply System Level III in Barangay Lumayao, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱8.0M
- Construction of Public Water Supply System Level III in Barangay Carayacan, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱7.0M
- Construction of Public Water Supply System Level III in Barangay Casantamarian, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱7.0M
- Construction of Public Water Supply System Level III in Barangay Bantog Cabangaran, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱7.0M
- Construction of Public Water Supply System Level III in Barangay Nangapugan, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱7.0M
- Construction of Public Water Supply System Level III in Barangay Gonzalo, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱7.0M
- Construction of Public Water Supply System Level III in Barangay Cabalaoangan, San Quintin, PangasinanPangasinan 1st District Engineering Office · NEP p.291₱7.0M
Source: DBM Details of DPWH Programs/Projects, NEP FY2027 (scanned PDF read by OCR; page numbers given). Search all lines

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in San Quintin (21)
Download this list with counts (CSV) · All bulk data
- Alac · 6 DPWH projects
- Baligayan · 4 DPWH projects
- Bantog · 9 DPWH projects
- Bolintaguen · 3 DPWH projects
- Cabalaoangan · 3 DPWH projects
- Cabangaran · 6 DPWH projects
- Calomboyan · 1 DPWH projects
- Carayacan · 3 DPWH projects
- Casantamarian · 4 DPWH projects
- Gonzalo · 11 DPWH projects
- Labuan · 1 DPWH projects
- Lagasit · 20 DPWH projects
- Lumayao · 6 DPWH projects
- Mabini · 1 DPWH projects
- Mantacdang · 5 DPWH projects
- Nangapugan · 7 DPWH projects
- Poblacion Zone I · 6 DPWH projects
- Poblacion Zone II · 2 DPWH projects
- Poblacion Zone III · 1 DPWH projects
- San Pedro · 3 DPWH projects
- Ungib · 4 DPWH projects
QR codes for San Quintin