Barangay
San Andres
San Andres, Cainta, Rizal, Region IV-A (CALABARZON). Urban. Population 122,983 (2024 POPCEN).
PSGC 0405805014 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to San Andres
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
25 records · ₱351,726,381.78
- Improvement of Slope Protection Along Buli Creek, Phase 1, Pasig City₱47,524,455.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Maintenance and Rehabilitation of Flood Control Structure Along Ilugin River, Pasig City₱45,822,749.02 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Rehabilitation of Slope Protection of Ilugin Creek, Pasig City₱36,944,328.02 · 2017 · medium confidence (project coordinates inside the barangay boundary)
- Rehabilitation of Road Network, Marikina City₱27,925,401.50 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Rehabilitation of Flood Mitigation Structure, Buli Creek at Barangay San Miguel and Pinagbuhatan, Pasig City₱26,918,501.97 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Improvement of Road With Drainage System at Anakpawis 2, Westbank, Floodway Cainta, Rizal₱19,205,971.41 · 2021 · medium confidence (project coordinates inside the barangay boundary)
How linked: 25 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱1,622,577.00
- Barangay San Andres, Cainta, Rizal₱1,622,577.00 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to San Andres itself. This shows the province figure for Rizal.
70,850 records · ₱157,337,540,777.27
70,828 placed at Rizal level itself; the rest in LGUs under it.
- Rizal₱157,337,540,777.27 · 70,828 awards · high confidence (area of delivery is this province only)
- Batangas, Cavite, Laguna, Quezon, Rizal₱26,970,394.00 · 11 awards · low confidence (area of delivery lists several provinces)
- Batangas, Cavite, Laguna, Marinduque, Oriental Mindoro, Quezon, Rizal, Romblon₱16,791,920.00 · 2 awards · low confidence (area of delivery lists several provinces)
- Quezon, Quirino, Rizal₱6,851,825.13 · 1 awards · low confidence (area of delivery lists several provinces)
- Laguna, Quezon, Rizal₱2,747,549.90 · 2 awards · low confidence (area of delivery lists several provinces)
- Quirino, Rizal₱467,415.00 · 2 awards · low confidence (area of delivery lists several provinces)
How linked: 70,828 by area of delivery is this province only; 22 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to San Andres itself. This shows the municipality figure for Cainta.
5 records · ₱38,353,945.00
4 placed at Cainta level itself; the rest in LGUs under it.
- Construction of Nature and Family Park₱13,353,945.00 · 2024 · high confidence (location columns in the DBM release)
- Repair/Rehabilitation/Upgrading of Roads and Drainage Canals (System)₱10,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families: Medical₱5,000,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of Multipurpose Building in Barangay, San Andres, Cainta, Rizal, Region Iv-A (Calabarzon)₱5,000,000.00 · 2025 · high confidence (location columns in the DBM release)
- Construction of Multi-Purpose Building in Barangay San Isidro, Cainta₱5,000,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 5 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
16 records · ₱317,737,000.00
- Construction of Flood Control Structure Along Buli Creek (Phase 2), Brgy. San Andres, Cainta, Rizal₱100,000,000.00 · 2023 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structures of Cainta River, Brgy. San Andres, Cainta, Rizal₱70,000,000.00 · 2021 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure Along Buli Creek (Urgent Protection Works), Barangay San Andres, Cainta, Rizal₱50,000,000.00 · 2022 · medium confidence (GAA line text names the place)
- Construction of Road With Drainage System Sta 0+000 - Sta. 0+540, Barangay San Andres, Cainta, Rizal₱16,037,000.00 · 2026 · medium confidence (GAA line text names the place)
- Construction of Road With Drainage System, Phase 9, Brgy. San Andres, Cainta, Rizal₱10,000,000.00 · 2022 · medium confidence (GAA line text names the place)
- Rehabilitation of Drainage Along Parola Street, Barangay San Andres, Cainta, Rizal₱10,000,000.00 · 2025 · medium confidence (GAA line text names the place)
How linked: 16 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- High Concurrent Workload for One ContractorSt Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard ConstContractor: St Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard Const
- High Concurrent Workload for One ContractorSt Timothy Const CorpContractor: St Timothy Const Corp
- High Concurrent Workload for One ContractorAnore ConstContractor: Anore Const
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 19 contractors on DPWH projects linked to San Andres and the LGUs under it. Click a column to sort.
| Dahl Const CORP Formerly: Dahl Const | 2 | ₱84,468,783.02 | 0 |
| St Gerrard Const Gen Contractor & Development CORP Formerly:St Gerrard Const | 1 | ₱45,822,749.02 | 1 |
| 729 Const INC Formerly 722 Const INC | 1 | ₱27,925,401.50 | 0 |
| St Timothy Const CORP | 1 | ₱26,918,501.97 | 1 |
| Zaneya Builders | 3 | ₱22,084,943.05 | 0 |
| Anore Const | 1 | ₱19,205,971.41 | 1 |
| Jagonbuild Const CORP For Jagon Builders | 1 | ₱17,366,964.41 | 0 |
| Red Tree Const | 2 | ₱14,750,000.00 | 0 |
| Triple K Const | 2 | ₱14,497,798.38 | 0 |
| Franzcor Trading | 2 | ₱13,018,312.22 | 0 |
| Tuchar Const CORP Formerly:Tuchar Constru | 1 | ₱12,892,795.33 | 0 |
| Hony Trading | 1 | ₱9,900,000.00 | 0 |
| Djl Robles Builders | 1 | ₱9,601,861.50 | 0 |
| 3rb Const | 1 | ₱9,601,019.45 | 0 |
| 121 Const CORP Formerly 121 Constuc | 1 | ₱7,600,620.90 | 0 |
| A J Lava Builders CORP Formerly: A J Lava Buil | 1 | ₱4,801,417.38 | 0 |
| C F Trinidad Const And Supplies CORP For | 1 | ₱4,607,047.42 | 0 |
| Ltdl Builders | 1 | ₱3,840,804.00 | 0 |
| Fastrack Home Developers INC | 1 | ₱2,821,390.82 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in Rizal
BIR publishes collections by province and city, not by town or barangay. San Andres is in Rizal.
₱7.25 billion
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
Coverage differs from the LGU boundary. BIR note: “Includes collections from the municipalities of Angono, Baras, Binangonan, Cainta, Cardona, Jala-Jala, Morong, Pililla, Tanay and Taytay in Rizal”
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for San Andres
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.