Public records linked to Sablayan
Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
247 records · ₱14,519,880,952.33
37 placed at Sablayan level itself; the rest in LGUs under it.
- Flood Management Program- Const./Rehab. of Flood Mitigation Facilities Within Major River Basins and Principal Rivers- Const. of Road Dike Mumpong River, Tuban-Batong Buhay, Brgy. Tuban, Sablayan, Occ. Mindoro₱291,775,718.09 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Flood Management Program- Const./Rehab. of Flood Mitigation Facilities Within Major River Basins and Principal Rivers- Const. of Road Dike, Mumpong River, Tuban-Sta. Lucia, Brgy. Tuban, Sablayan, Occ. Mindoro₱291,496,691.76 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Sustainable Infrastructure Projects Alleviating Gaps (Sipag)- Access Roads and/Or Bridges From the National Road/S Leading to Major/Strategic Public Buildings/Facilities- Const. of Road Dike Along Mongpong, Brgy. Sta. Lucia, Sablayan, Occ. Mindoro₱289,497,186.13 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control Structure (River Training Works) Along Mompong River (Downstream), Sablayan, Occidental Mindoro₱289,496,842.10 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Basic Infrastructure Program (Bip)- Access Roads and/Or Bridges From the National Road/S Leading to Major/Strategic Public Bildings/Facilities- Const. of Road Dike Along Patrick River, Brgy. Victoria Section, Phase Iii, Sablayan, Occ. Mindoro₱287,121,999.83 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Suistainable Infrastructure Projects Alleviating Gaps (Sipag)- Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities- Const. of Road Dike Along Patrick River, Brgy. Victoria Section, Phase I, Sablayan, Occ. Mindoro₱280,163,941.54 · 2024 · medium confidence (project coordinates inside the barangay boundary)
How linked: 210 by project coordinates inside the barangay boundary; 32 by project title names the place; 5 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
22 records · ₱2,709,643,287.88
1 placed at Sablayan level itself; the rest in LGUs under it.
- Municipality of Sablayan, Occidental Mindoro₱2,629,093,278.05 · high confidence (the LGU itself is the buyer)
- Barangay Buenavista, Sablayan, Occidental Mindoro₱11,188,900.23 · high confidence (the LGU itself is the buyer)
- Barangay Ligaya, Sablayan, Occidental Mindoro₱7,314,779.36 · high confidence (the LGU itself is the buyer)
- Barangay San Vicente, Sablayan, Occidental Mindoro₱6,401,519.05 · high confidence (the LGU itself is the buyer)
- Barangay Sta. Lucia, Sablayan, Occidental Mindoro₱6,047,259.81 · high confidence (the LGU itself is the buyer)
- Barangay Poblacion - Sablayan, Occidental Mindoro₱5,989,750.50 · high confidence (the LGU itself is the buyer)
How linked: 22 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Sablayan itself. This shows the province figure for Occidental Mindoro.
27,956 records · ₱55,997,838,230.02
27,854 placed at Occidental Mindoro level itself; the rest in LGUs under it.
- Occidental Mindoro₱55,997,838,230.02 · 27,854 awards · high confidence (area of delivery is this province only)
- Marinduque, Occidental Mindoro, Oriental Mindoro, Palawan, Romblon₱151,598,207.10 · 42 awards · low confidence (area of delivery lists several provinces)
- Occidental Mindoro, Oriental Mindoro, Palawan₱26,703,956.20 · 15 awards · low confidence (area of delivery lists several provinces)
- Aurora, Bulacan, Ilocos Sur, Marinduque, Nueva Vizcaya, Occidental Mindoro, Oriental Mindoro, Palawan, Pangasinan, Romblon₱7,941,750.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Batangas, Marinduque, Occidental Mindoro, Oriental Mindoro, Palawan, Romblon₱7,788,373.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Occidental Mindoro, Oriental Mindoro, Romblon₱6,660,521.60 · 8 awards · low confidence (area of delivery lists several provinces)
How linked: 27,854 by area of delivery is this province only; 102 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
10 records · ₱46,106,882.16
1 placed at Sablayan level itself; the rest in LGUs under it.
- Concreting of Farm-to-Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Upgrading of Farm-to-Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm-to-Market Road₱6,606,882.16 · 2023 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Opening With Concreting of Farm-to-Market Road (So. Calamsian-So.Kemali) Brgy. San Agustin)₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Construction of School Building at So. Tulaleng, Brgy. Pag-Asa₱2,500,000.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 10 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
139 records · ₱8,643,509,000.00
88 placed at Sablayan level itself; the rest in LGUs under it.
- Construction of Road Dike, Mumpong River, Tuban-Batong Buhay, Barangay Tuban, Sablayan, Occidental Mindoro₱315,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Road Dike, Mumpong River, Tuban-Sta. Lucia, Barangay Tuban, Sablayan, Occidental Mindoro₱315,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure ( River Training Works ) Along Mompong River ( Downstream ) , Sablayan, Occidental Mindoro₱300,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Road Dike Along Mongpong Barangay Santa Lucia, Sablayan, Occidental Mindoro₱300,000,000.00 · 2024 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Mompong River, Barangay Santa Lucia, Sablayan, Occidental Mindoro₱250,000,000.00 · 2025 · medium confidence (GAA line text names the place)
- Construction of Flood Control Structure, Mompong River, Barangay Santa Lucia (Upstream - Rs), Sablayan, Occidental Mindoro₱250,000,000.00 · 2025 · high confidence (GAA line text names the place)
How linked: 139 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
- Contractor Concentration (Flood Control)Legacy Const Corp Formerly: Legacy ConstContractor: Legacy Const Corp Formerly: Legacy Const
- Contractor Concentration (Flood Control)Sunwest Inc Formerly: Sunwest Const & Development CorpContractor: Sunwest Inc Formerly: Sunwest Const & Development Corp
- High Concurrent Workload for One ContractorEgb Const Corp Formerly: Egb ConstContractor: Egb Const Corp Formerly: Egb Const
- Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Amnay River, Sta. 0+320 - Sta. 0+603, Claudio Salgado Section, Sablayan, Occidental MindoroContractor: Anore Const
- Pattern Consistent with Contract SplittingConstruction of Patrick Flood Control (Kambingan Section), Sta. 0+000 - Sta. 0+070 (Rs), Sta. 0+140 - Sta. 0+477.25 (Rs), Sablayan, Occidental MindoroContractor: Anore Const
- Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Amnay River, Sta. 0+000 - Sta. 0+307, Ilvita Section, Sablayan, Occidental MindoroContractor: Anore Const
Contractors on linked DPWH projects
Download this list (CSV) · All bulk data
All 68 contractors on DPWH projects linked to Sablayan and the LGUs under it. Click a column to sort.
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.
Taxes collected by the BIR in Occidental Mindoro
BIR publishes collections by province and city, not by town or barangay. Sablayan is in Occidental Mindoro.
₱768.6 million
Collected, January-August 2026 (tentative BIR figures, ₱ million in the source)
These are taxes collected by national BIR offices located here, including from businesses headquartered here. They are not the LGU’s own income. Source: BIR Revenue Accounting Division, Tentative internal revenue collections by region and province, January-August 2026 (BIR collection statistics). All provinces and cities
Proposed for 2027: DPWH projects
5 line items worth ₱30.0M in the FY2027 National Expenditure Program (FY2026 NEP: 4 worth ₱236.5M). Counted from lines that name Sablayan.
- Construction of Multi-Purpose Building, Barangay Ligaya, Sablayan, Occidental MindoroMindoro Occidental District Engineering Office · NEP p.510₱10.0M
- Construction of Multi-Purpose Building, Barangay Claudio Salgado, Sablayan, Occidental MindoroMindoro Occidental District Engineering Office · NEP p.510₱5.0M
- Construction of Multi-Purpose Building, Barangay Ilvita, Sablayan, Occidental MindoroMindoro Occidental District Engineering Office · NEP p.510₱5.0M
- Construction of Multi-Purpose Building, Barangay Malisbong, Sablayan, Occidental MindoroMindoro Occidental District Engineering Office · NEP p.510₱5.0M
- Construction of Multi-Purpose Building, Barangay Tuban, Sablayan, Occidental MindoroMindoro Occidental District Engineering Office · NEP p.511₱5.0M
Source: DBM Details of DPWH Programs/Projects, NEP FY2027 (scanned PDF read by OCR; page numbers given). Search all lines

Share this page
The card shows the public record facts and a QR code back to this page.
Barangays in Sablayan (22)
Download this list with counts (CSV) · All bulk data
- Batong Buhay · 18 DPWH projects
- Buenavista · 6 DPWH projects
- Burgos · 12 DPWH projects
- Claudio Salgado · 5 DPWH projects
- General Emilio Aguinaldo · 4 DPWH projects
- Ibud · 2 DPWH projects
- Ilvita · 15 DPWH projects
- Lagnas · 7 DPWH projects
- Ligaya · 2 DPWH projects
- Malisbong · 16 DPWH projects
- Paetan · 7 DPWH projects
- Pag-Asa · 21 DPWH projects
- Poblacion · 9 DPWH projects
- San Agustin · 5 DPWH projects
- San Francisco · 5 DPWH projects
- San Nicolas · 2 DPWH projects
- San Vicente · 5 DPWH projects
- Sta. Lucia · 14 DPWH projects
- Sto. Niño · 19 DPWH projects
- Tagumpay · 13 DPWH projects
- Tuban · 16 DPWH projects
- Victoria · 7 DPWH projects
QR codes for Sablayan
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.