| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Flood Control Management Cluster | ₱1.45B | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 16 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Flood Control Management Cluster | ₱945.5M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 140 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱931.7M | Reported complete | RAYMAN BUILDERS INC | 137 | Check in |
| RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱907.5M | Reported complete | RAYMAN BUILDERS INC | 143 | Check in |
| Construction of Casalogan River Control, Casiguran, Aurora | CASIGURAN (AURORA), AURORA | ₱289.5M | Reported complete | DALCON CONST / EGB CONST CORP FORMERLY: EGB CONST | 89 | Check in |
| CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱198.7M | Reported complete | A D GONZALES JR CONST | 123 | Check in |
| Construction of Bulos Flood Control Structure, Dipaculao, Aurora | DIPACULAO (AURORA), AURORA | ₱193.0M | Reported complete | R D TALENS CONST AND TRADING | 136 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RO | Region II | ₱191.0M | 88% reported progress | R S K M CONST SERVICES | 137 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAG | Region II | ₱190.8M | 93% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 103 | Check in |
| FLOOD CONTROL WORKS - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱186.4M | Reported complete | A D GONZALES JR CONST | 123 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, AGASIAN, ILAGAN, ISABELA, STA. 000+000-STA. 1+020 (D | Region II | ₱186.0M | Reported complete | E M CUERPO INC | 132 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARA | Region II | ₱183.0M | Reported complete | DOUBLE J1908 CONST | 140 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | ₱182.6M | 72% reported progress | JOMARCANN GEN CONST | 119 | Check in |
| Construction of Magat River Flood Control Project, Barangay Turod, Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONST SUPPLY AND POWER DEVELOPMENT | 118 | Check in |
| ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRU | Isabela 2nd DEO | ₱144.7M | Reported complete | JWU CONST AND SUPPLY | 138 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEM | Isabela 1st DEO | ₱144.7M | Reported complete | DRAGON TWELVE BUILDERS | 129 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PACKAGE 2, GUIBANG, | Isabela 3rd DEO | ₱144.7M | 94% reported progress | JWU CONST AND SUPPLY | 112 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN | Isabela 3rd DEO | ₱144.7M | 90% reported progress | JWU CONST AND SUPPLY | 115 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN SE | Isabela 3rd DEO | ₱144.7M | 91% reported progress | JWU CONST AND SUPPLY | 114 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTA | Isabela 3rd DEO | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 114 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC | Isabela 3rd DEO | ₱144.7M | 86% reported progress | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 115 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALITAO FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+ | Isabela 4th DEO | ₱144.7M | Reported complete | JWU CONST AND SUPPLY | 133 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0 | Isabela 4th DEO | ₱144.7M | 81% reported progress | JWU CONST AND SUPPLY | 131 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0 | Isabela 4th DEO | ₱144.7M | 73% reported progress | JWU CONST AND SUPPLY | 131 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINABBARAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. | Isabela 4th DEO | ₱144.7M | 49% reported progress | JWU CONST AND SUPPLY | 126 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE | Isabela 1st DEO | ₱144.7M | 98% reported progress | DRAGON TWELVE BUILDERS | 111 | Check in |
| Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela | SANTA MARIA (ISABELA), ISABELA | ₱144.7M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 132 | Check in |
| Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2 | REINA MERCEDES (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 119 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, Package 2, Barangay District 2, Gamu, Isabela | GAMU (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES | 112 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, Package 1, Barangay District 2, Gamu, Isabela | GAMU (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES | 113 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF COMPANIA FLOOD CONTROL, | Isabela 1st DEO | ₱144.7M | Reported complete | ARVEA'S CONST | 119 | Check in |
| Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 1 | REINA MERCEDES (ISABELA), ISABELA | ₱144.5M | Reported complete | A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST | 120 | Check in |
| FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Isabela 4th DEO | ₱144.4M | 81% reported progress | EDDMARI CONST | 121 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION WORKS FO | Isabela 4th DEO | ₱142.6M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 120 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CASALOGAN FLOOD CONTROL STRUCTURE, CASIGURAN, AURORA | Region III | ₱141.9M | 69% reported progress | DALCON CONST | 89 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (CULLALABO SUR SECTION), BARANGAY CULLALABO, BURGOS, ISABELA | Isabela 2nd DEO | ₱140.4M | 42% reported progress | RR BUILDERS | 128 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (LANTING SECTION), ROXAS,ISABELA | Isabela 2nd DEO | ₱140.4M | 47% reported progress | JWU CONST AND SUPPLY | 133 | Check in |
| OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANQUERO, DOWNSTREAM, PHASE2 | Isabela 3rd DEO | ₱140.4M | 57% reported progress | JWU CONST AND SUPPLY | 120 | Check in |
| OO2:FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES DRAINAGE SYSTEMS -CONSTRUCTION OF BUGNAY CREEK FLOOD CONTROL PROJECT, DALIG SECTION, BURGOS, ISABELA | Isabela 2nd DEO | ₱140.4M | 43% reported progress | JWU CONST AND SUPPLY | 126 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, RIZAL SECTION, ROXAS, ISABELA | Isabela 2nd DEO | ₱140.4M | 4% reported progress | JWU CONST AND SUPPLY | 136 | Check in |
| Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 105 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, Isabela | SANTO TOMAS (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 128 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 111 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 112 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, Isabela | CABAGAN (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 128 | Check in |
| REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. ANQUIRAY, AMULUNG, CAGAYAN (DOWNSTREAM) STA. 0+320 - STA. 0+520 | Cagayan 3rd DEO | ₱136.4M | 92% reported progress | MEGAY CONST INC FORMERLY: MEGAY CONST | 146 | Check in |
| REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. PATA, ENRILE, CAGAYAN (DOWNSTREAM) STA. 0+230 - STA. 0+430 | Cagayan 3rd DEO | ₱136.3M | 55% reported progress | MEGAY CONST INC FORMERLY: MEGAY CONST | 143 | Check in |
| CLUSTER: 1. CONSTRUCTION OF SAN JUAN FLOOD CONTROL, STA. 38+023 - STA. 38+792 (LS) 2. CONSTRUCTION OF CALUPAAN FLOOD CONTROL, STA. 40+975 - STA. 41+668 (LS), 3. CONSTRUCTION OF CALIMAG FLOOD CONTROL, STA. 5+823 - STA. 6+132, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | ₱123.5M | Reported complete | DJY CONST | 145 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM - CONST'N/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONST'N OF MAGAT RIVER FLOOD MNG'T, SAN ROQUE, SAN MATEO, ISABELA | Region II | ₱121.9M | Reported complete | J H PAJARA CONST CORP | 141 | Check in |
| Construction of Santos Flood Control Structures, Santos, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱115.8M | Reported complete | V B MANUBAY CONST | 125 | Check in |
| OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEMS (UPSTREAM), SAN PABLO ISABELA | Region II | ₱114.4M | 89% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 131 | Check in |
| LOCAL PROGRAM: FLOOD CONTROL AND DRAINAGE/FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ARCON FLOOD CONTROL SYSTEM, PHASE II | Region II | ₱112.9M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 118 | Check in |
| Construction of Balug Flood Control at Tumauini, Isabela | TUMAUINI (ISABELA), ISABELA | ₱109.1M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 116 | Check in |
| Construction of Carpentero-Compania Flood Control Phase II, Tumauini, Isabela | TUMAUINI (ISABELA), ISABELA | ₱108.7M | Reported complete | ARVEA'S CONST / EGB CONST CORP FORMERLY: EGB CONST | 120 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF CAPO FLOOD CONTROL SYSTEM, ILAGAN CITY, ISABELA | Region II | ₱108.4M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 108 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PANANG FLOOD CONTROL STRUCTURE, SECTION 2, SAN AGUSTI | Isabela 4th DEO | ₱106.1M | 89% reported progress | MAR-DEB CONST | 126 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NEMMATAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUS | Isabela 4th DEO | ₱106.1M | 66% reported progress | D A CADELIÑA CONST | 125 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF QUIMALABASA NORTE FLOOD CONTROL STRUCTURE SECTION 5, | Isabela 4th DEO | ₱106.1M | 87% reported progress | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 122 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PALACIAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUS | Isabela 4th DEO | ₱106.0M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 126 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE A | Isabela 1st DEO | ₱101.3M | 85% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 111 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Isabela 1st DEO | ₱101.3M | 73% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 110 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Isabela 1st DEO | ₱101.3M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 131 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-RIVER BANK PROTECTION FOR LOWER CAGAYAN RIVER, TUMAUINI, ISABELA (UPSTREAM) | Region II | ₱100.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 117 | Check in |
| Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 2), Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱99.0M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 114 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE PATANAD SECTION 2, SAN ISIDRO, ISABELA | Isabela 4th DEO | ₱99.0M | 96% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 133 | Check in |
| Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 1), Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱99.0M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 114 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA | Isabela 3rd DEO | ₱99.0M | Reported complete | MAR-DEB CONST | 114 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BRGY. BANQUERO, REINA MERCEDES, ISABELA | Isabela 3rd DEO | ₱99.0M | Reported complete | MAR-DEB CONST | 121 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION (CONTINUATION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA MERCEDES, | Isabela 3rd DEO | ₱99.0M | Reported complete | MAR-DEB CONST | 114 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. ROXAS (STA. 0+000 - STA. 0+510) NAGUILIAN, ISABELA | Isabela 3rd DEO | ₱99.0M | 96% reported progress | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 114 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF VIRGONEZA FLOOD CONTROL STRUCTURE, SECTION 4, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | 0% reported progress | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 123 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. PALAGAO FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | V B MANUBAY CONST | 127 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. PAPAN WESTE FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | V B MANUBAY CONST | 119 | Check in |
| Construction of Dipangit Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 130 | Check in |
| Construction of Barangay Quimalabasa Norte Flood Control Project, Section 2, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 122 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF STA. ISABEL FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 111 | Check in |
| Construction of Masaya Centro Flood Control Structure, Section 1, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 123 | Check in |
| Construction of Flood Control Structure at Brgy. Carabatan Chica, Cauayan City, Isabela | CITY OF CAUAYAN (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 118 | Check in |
| Construction of Dumawing Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 112 | Check in |
| Construction of Digumased Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 760, Dinapigue, Isabela | DINAPIGUE (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 68 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SINILI FLOOD CONTROL STRUCTURE, SECTION 1, SANTIAGO CITY, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 147 | Check in |
| Construction of Barangay Salay Flood Control Structure, Section 2, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 121 | Check in |
| Construction of Dipangit Flood Control Structure, Section 4, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 129 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING /FACILITIES - CONSTRUCTION OF BARANGAY 1 FLOOD CONTROL STRUCTURE, SECTION 1, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | 94% reported progress | DALCON CONST | 128 | Check in |
| Construction of Barangay Dibuluan Flood Control Structure, Section 3, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 121 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIBULO FLOOD CONTROL STRUCTURE, SECTION 4, DINAPIGUE, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 72 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF AYOD FLOOD CONTROL STRUCTURE, SECTION 1, DINAPIGUE, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | COLBY CONST | 67 | Check in |
| Construction of Buringal Proper Flood Control (Sulinek Section), Sta. 065+507 - Sta. 066+407 (Right Side), Buringal, Paracelis, Mountain Province | PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE | ₱96.5M | Reported complete | UPLAND CONST AND ENGINEERING SERVICES | 145 | Check in |
| Construction of Barangay Papan Weste Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 119 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF MASAYA SUR FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. MASAYA SUR, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 123 | Check in |
| Construction of Nabbuan Flood Control Structure, Nabbuan, Santiago City, Isabela | ISABELA | ₱96.5M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 142 | Check in |
| Construction of Malannit Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 132 | Check in |
| Construction of Papan Weste Flood Control Structure, Section 4, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 119 | Check in |
| Construction of Sinsayon Flood Control Structure, Sinsayon, Santiago City, Isabela | ISABELA | ₱96.5M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 146 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DAPPIG FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+790, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | 99% reported progress | DALCON CONST | 125 | Check in |
| Construction of Flood Control Structure at Brgy. Camarag-Fugu bridge Approach, Brgy. Camarag, San Isidro, Isabela | SAN ISIDRO (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 133 | Check in |
| Construction of Flood Control Structure, Barangay Digumased, Section 1, Dinapigue, Isabela | DINAPIGUE (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 67 | Check in |
| Construction of Bautista Flood Control Structure, Section 1, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 114 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DIBULO FLOOD CONTROL STRUCTURE ,SECTION 3, DINAPIGUE,ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 72 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAPALAD FLOOD CONTROL STRUCTURES, STA. 0+000 - STA. 0+7 | Isabela 4th DEO | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 120 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BUCAL NORTE FLOOD CONTROL STRUCTURE, SECTION 4, DINAPIGUE, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 67 | Check in |
| Construction of Barangay Virgoneza Flood Control Structure, Section 1, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 124 | Check in |
| Construction of Barangay Virgoneza Flood Control Structure, Section 2, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | COLBY CONST | 124 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF DIVISORIA FLOOD CONTROL STRUCTURE, SECTION 1, SANTIAGO CITY, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 138 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF NAGASICAN FLOOD CONTROL STRUCTURE SECTION 1, SANTIAGO CITY, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 139 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING /FACILITIES - CONSTRUCTION DABUBU PEQUEÑO FLOOD CONTROL STRUCTURE, STA. 0+000-STA.0+790, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | COLBY CONST | 122 | Check in |
| Construction of Barangay Minuri Flood Control Structure, Section 3, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 113 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. MINURI FLOOD CONTROL STRUCTURE, SECTION 4, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | V B MANUBAY CONST | 111 | Check in |
| Construction of Dibuluan Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 121 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF STA. ISABEL FLOOD CONTROL STRUCTURE, SECTION 1, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | 71% reported progress | DALCON CONST | 112 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CALAO EAST FLOOD CONTROL STRUCTURE, SECTION 1,SANTIAGO CITY, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 143 | Check in |
| Construction of Villa Victoria Flood Control Structure, Brgy. Villa Victoria, Echague, Isabela | ECHAGUE (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 131 | Check in |
| Construction of Dedekkel Flood Control Structure, Section 1, Dinapigue, Isabela | DINAPIGUE (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 69 | Check in |
| Construction of Flood Control Structure at Brgy. Papan Este, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 118 | Check in |
| Construction of Barangay Palagao Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 126 | Check in |
| Construction of Barangay 2 Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST / VBM CONST CORP | 129 | Check in |
| Construction of Guyabal Flood Control Project, Guyabal, Cauayan City, Isabela | CITY OF CAUAYAN (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 116 | Check in |
| Construction of Dipangit Flood Control Structure, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 130 | Check in |
| Construction of Barangay Quimalabasa Norte Flood Control Project, Section 1, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 123 | Check in |
| Construction of Dipangit Flood Control Structure, Section 3, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 129 | Check in |
| Construction of Dibuluan Flood Control Structure, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 122 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONSTRUCTION OF PALACIAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | 0% reported progress | V B MANUBAY CONST | 125 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MABINI FLOOD CONTROL STRUCTURE, SECTION 1, SANTIAGO CITY, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | DALCON CONST | 144 | Check in |
| Construction of Mallig River Flood Control Project, Barangay Sto. Domingo, Sta .0+000 - Sta. 0+800, Quirino, Isabela | QUIRINO (ISABELA), ISABELA | ₱96.5M | Reported complete | DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST | 124 | Check in |
| Construction of Flood Control Structure, Barangay II, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 128 | Check in |
| Construction of Siffu River Flood Control Project (Rang-Ayan Section), Roxas, Isabela | ROXAS (ISABELA), ISABELA | ₱96.5M | Reported complete | SIFFU ROCKS CONST / C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 135 | Check in |
| Construction of Barangay Sto. Domingo Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 110 | Check in |
| Construction of Linomot Flood Control Structure, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 116 | Check in |
| Construction of Barangay Sto. Domingo Flood Control Structure, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 111 | Check in |
| Construction of Barangay Palagao Flood Control Structure, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 126 | Check in |
| Construction of Flood Control Structure at Brgy. Calaocan Section 2, Santiago City, Isabela | CITY OF SANTIAGO (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 144 | Check in |
| Construction of Arubub Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 730, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 131 | Check in |
| Construction of Flood Control Structure at Brgy. Calaocan Section 1, Santiago City, Isabela | CITY OF SANTIAGO (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 144 | Check in |
| Construction of Barangay Salay Flood Control Structure, Section 1, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 120 | Check in |
| Construction of Linomot Flood Control Structure, Section 1, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | DALCON CONST | 115 | Check in |
| Construction of Mallig River Flood Control Project (Luna Section), Quirino, Isabela | QUIRINO (ISABELA), ISABELA | ₱96.5M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 129 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGAY SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTIO | Isabela 4th DEO | ₱96.5M | Reported complete | ROAD EDGE TRADING | 125 | Check in |
| Construction of Tagaran Flood Control Project, Tagaran, Cauayan City, Isabela | CITY OF CAUAYAN (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 119 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF BARANGAY SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTIO | Isabela 4th DEO | ₱96.5M | Reported complete | COLBY CONST | 125 | Check in |
| ORGANIZATIONAL OUTCOME 2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, BARANGAY LUNA PHASE II, QUIRINO, ISABEL | Isabela 2nd DEO | ₱96.5M | Reported complete | A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST | 128 | Check in |
| Construction of Maligaya Flood Control Structure, Brgy. Maligaya, Echague, Isabela | ECHAGUE (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 133 | Check in |
| Construction of Mallig River Flood Control Project, Barangay Imbiao Phase II, Sta. 0+960 - Sta. 1+760, Roxas, Isabela | ROXAS (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 133 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. STO. DOMINGO FLOOD CONTROL STRUCTURE, SECTION 4, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 110 | Check in |
| Construction of Flood Control Structure along Magat River Bank - Barangay San Roque, San Mateo, Isabela | ISABELA | ₱96.5M | Reported complete | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 141 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SEAWALL, BARANGAY PADDAYA, APARRI, CAGAYAN | Cagayan 1st DEO | ₱96.5M | 88% reported progress | TJMT CONST | 148 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN JOSE NORTE SECTION)BARANGAY SAN JOSE NORTE, MALLIG, ISABELA | Isabela 2nd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 144 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF QUIMALABASA NORTE FLOOD CONTROL STRUCTURE, SECTION 4, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 122 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF BRGY. SINAOANGAN SUR FLOOD CONTROL STRUCTURE, SECTION 3, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | 77% reported progress | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 125 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE, PHASE 2, SANTA CATALINA SECTION, QUIRINO, ISABELA | Isabela 2nd DEO | ₱96.5M | 89% reported progress | JWU CONST AND SUPPLY | 131 | Check in |
| OO2 FLOOD MANAGEMENT PROGRAM - CONSTRUCTION MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (SAN JOSE SUR SECTION), BARANGAY SAN JOSE SUR, MALLIG, ISABELA | Isabela 2nd DEO | ₱96.5M | 94% reported progress | JWU CONST AND SUPPLY | 143 | Check in |
| Construction of Siffu River Flood Control Project (San Luis Section), Roxas, Isabela | ROXAS (ISABELA), ISABELA | ₱96.5M | Reported complete | A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST | 134 | Check in |
| Construction of Flood Control Structure, Ipil, Echague, Isabela | ECHAGUE (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 135 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BRGY. STO. DOMINGO FLOOD CONTROL STRUCTURE, SECTION 3, JONES, ISABELA | Isabela 4th DEO | ₱96.5M | 0% reported progress | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 116 | Check in |
| LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL STRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAGAYAN RIVER BANK - BRGY. PAPPAT, ANGADANAN, ISA | Isabela 3rd DEO | ₱96.5M | Reported complete | D A CADELIÑA CONST | 124 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES- CONSTRUCTION OF BRGY. QUIMALABASA NORTE FLOOD CONTROL PROJECT, SECTION 3, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | 0% reported progress | GACUTAN CONST INC FORMERLY: GACUTAN CONST | 123 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, barangay Arusip, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱96.5M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 112 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL , BRGY. YEBAN SUR (STA.0 | Isabela 3rd DEO | ₱96.5M | 86% reported progress | JWU CONST AND SUPPLY | 101 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, STA. 1+400- STA. 2 + 044.50, PHASE II, BARANGAY SAN JUAN, QUIRINO, ISABELA | Isabela 2nd DEO | ₱96.5M | 90% reported progress | JWU CONST AND SUPPLY | 128 | Check in |
| Construction of Flood Control Structure along Ganano River Bank, Barangay Sta Cruz, Alicia, Isabela | ISABELA | ₱96.5M | Reported complete | C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC | 128 | Check in |
| ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, STA. 1 + 760 - STA. 2 + | Isabela 2nd DEO | ₱96.5M | 90% reported progress | JWU CONST AND SUPPLY | 133 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE | Isabela 1st DEO | ₱96.5M | Reported complete | DRAGON TWELVE BUILDERS | 112 | Check in |
| Construction of Barangay Sinaoangan Norte Flood Control Structure, Section 2, San Agustin, Isabela | SAN AGUSTIN (ISABELA), ISABELA | ₱96.5M | Reported complete | V B MANUBAY CONST | 124 | Check in |
| Construction of Mallig River Flood Control Project, Barangay Binarzang, Quirino, Isabela (Sta. 0+000 - Sta. 1+100) | QUIRINO (ISABELA), ISABELA | ₱96.5M | Reported complete | A COLOMA CONST / JWU CONST AND SUPPLY | 131 | Check in |
| ORGANIZATIONAL OUTCOME 2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, STA.1 + 400 - STA. 2 + | Isabela 2nd DEO | ₱96.5M | 80% reported progress | JWU CONST AND SUPPLY | 117 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD MITIGATION STRUCTURE, BARGY. RANG-AY, CABATUAN, ISABELA | Isabela 3rd DEO | ₱96.5M | 73% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 138 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT(PHASE 1), BARANGAY MALUNO SUR, BENITO | Isabela 3rd DEO | ₱96.5M | 89% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 99 | Check in |
| OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD PROJECT, BRGY. YEBAN | Isabela 3rd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 101 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (PHASE 3), BARANGAY MALUNO SUR, BENITO | Isabela 3rd DEO | ₱96.5M | 90% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 100 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (PHASE 2), BARANGAY MALUNO SUR, BENITO | Isabela 3rd DEO | ₱96.5M | 78% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 100 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL PROJECT AT MACANAO CREEK, PHASE I, BRGY. LUZON | Isabela 3rd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 128 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (PHASE 4), BARANGAY MALUNO SUR, BENITO | Isabela 3rd DEO | ₱96.5M | 79% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 100 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT 3 | Isabela 3rd DEO | ₱96.5M | 70% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 115 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT ALONG GANANO RIVER BANK,BRGY. SAN ANTONIO | Isabela 3rd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 129 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF TAO TAO RIVER FLOOD CONTROL PROJECT, (PANICIEN SECTION) | Isabela 2nd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 137 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL ALONG GANANO RIVER BANK, BRGY SANTA MARIA | Isabela 3rd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 129 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL, BARANGAY MAPUROC, SAN MATEO, ISABELA | Isabela 3rd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 143 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-REHABILITATION (CONTINUATION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY FURAO, | Isabela 3rd DEO | ₱96.5M | Reported complete | MAV CONST SUPPLY AND POWER DEVELOPMENT | 118 | Check in |
| Construction of Pinacanauan River Flood Control Project, Barangay Maluno, Sta. 0+000 - Sta. 0+722, Benito Soliven, Isabela | BENITO SOLIVEN (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 100 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJ, BRGY. SANTIAGO, REINA | Isabela 3rd DEO | ₱96.5M | Reported complete | MAV CONST SUPPLY AND POWER DEVELOPMENT | 121 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. UPI, GA | Isabela 3rd DEO | ₱96.5M | Reported complete | MAV CONST SUPPLY AND POWER DEVELOPMENT | 115 | Check in |
| Construction of Flood Control Structure, Barangay Saranay, Cabatuan, Isabela | CABATUAN (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 130 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN ANTONIO, ALICIA, ISABELA | Isabela 3rd DEO | ₱96.5M | 75% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 129 | Check in |
| Construction of Flood Control Structure, Barangay Arubub, Section 2, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 129 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANTUG, | Isabela 3rd DEO | ₱96.5M | 80% reported progress | ROAD EDGE TRADING | 123 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF CASILI CREEK RIVER FLOOD CONTROL PROJECT ALONG PRESIDENT BRIDGE, (MALIGAYA SECTION UPSTREAM), MALL | Isabela 2nd DEO | ₱96.5M | 88% reported progress | JWU CONST AND SUPPLY | 135 | Check in |
| ORGANIZATIONAL OUTCOME 2 : FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, BARANGAY SANTIAGO, STA. 0+000 - STA. 0+ | Isabela 2nd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 123 | Check in |
| CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF MINANGA FLOOD CONTROL PROJECT, STA. 0+000 - STA. 0+270.20, NAGUILIAN, ISABELA | Isabela 3rd DEO | ₱96.5M | 99% reported progress | JWU CONST AND SUPPLY | 114 | Check in |
| Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+000 - Sta. 0+067.90, Sta. 0+070.90 - Sta. 0+465.60), Alicia, Isabela | ALICIA (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 128 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CASILI CREEK RIVER FLOOD CONTROL PROJECT ALONG PRESIDENT BRIDGE, (MALIGAYA SECTION DOWNSTREAM), MALLIG, ISABELA | Isabela 2nd DEO | ₱96.5M | 94% reported progress | JWU CONST AND SUPPLY | 135 | Check in |
| Construction of Ganano River Flood Control Project, Barangay Apanay Downstream (Sta. 0+000 - Sta. 0+470.40), Alicia, Isabela | ALICIA (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 128 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL, BRGY. SAN MANUEL, NAGUI | Isabela 3rd DEO | ₱96.5M | 91% reported progress | MAV CONST SUPPLY AND POWER DEVELOPMENT | 112 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE SECTION 2, BARANGAY STO. NIÑO, SAN AGUSTIN, ISABELA | Isabela 4th DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 120 | Check in |
| Construction of Flood Control Struture, Barangay Tupax, Jones, Isabela | JONES (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 131 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BARANGAY TALLUNGAN | Isabela 3rd DEO | ₱96.5M | 91% reported progress | JWU CONST AND SUPPLY | 115 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. LENZON, (STA 0 | Isabela 3rd DEO | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 115 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BARANGAY SAN ISIDRO SECTION, LUNA, ISABELA | Isabela 2nd DEO | ₱96.5M | 84% reported progress | JWU CONST AND SUPPLY | 126 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BRGY. CUTOG GRANDE, | Isabela 3rd DEO | ₱96.5M | Reported complete | MAV CONST SUPPLY AND POWER DEVELOPMENT | 122 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, GANANO RIVER, UPSTREAM, BRGY. STA | Isabela 3rd DEO | ₱96.5M | 72% reported progress | JWU CONST AND SUPPLY | 130 | Check in |
| Construction of Cagayan River Flood Control Project at Barangay Minanga, Naguilian, Isabela | NAGUILIAN (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 114 | Check in |
| Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+465.50 - Sta. 0+928.20), Alicia, Isabela | ALICIA (ISABELA), ISABELA | ₱96.5M | Reported complete | JWU CONST AND SUPPLY | 128 | Check in |