Published flags in Ilocos Norte
106 published flags on records linked to Ilocos Norte and the LGUs under it. A flag is an automated anomaly that reviewers checked before publishing: a question worth asking, not a finding of wrongdoing.
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Padsan River, Barangay 17 San Felipe, Sarrat, Ilocos Norte (Phase 2)DPWH project · contractor North Tech Builders and Const Supply / Red Jewel Builders
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Project Along Sarrat Padsan River Basin, Barangay San Lorenzo and Barangay 10 San Miguel, Sarrat, Ilocos NorteDPWH project · contractor North Tech Builders and Const Supply
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bislak River, Brgy. San Ramon, Vintar, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp / Hekler Builders Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bislak River, Brgy. San Ramon, 0+000-0+836, Vintar, Ilocos NorteDPWH project · contractor Jca Const and Const Supply
- C1 · Contractor Concentration (Flood Control)Mg Samidan ConstContractor (applies to all its work) · contractor Mg Samidan Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Badoc River Barangay Balbaldez, Badoc, Ilocos NorteDPWH project · contractor Badoc Builders & Supply Inc Formerly: Badoc Builder & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Dongdong River (Left Bank), Barangay Acnam, Sitio Saranay, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Gadgadawan River (Right Bank), Barangay Barikir, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C1 · Contractor Concentration (Flood Control)Mg Samidan ConstContractor (applies to all its work) · contractor Mg Samidan Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Badoc River, Brgy. Balbaldez, Badoc, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Barangay Cabaruan, Bacarra, Ilocos NorteDPWH project · contractor Zedik Builders
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Dongdong River (Left Bank), Barangay Acnam, Sitio Venus 1, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C1 · Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor (applies to all its work) · contractor Alpha & Omega Gen Contractor & Development Corp
- C1 · Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor (applies to all its work) · contractor Alpha & Omega Gen Contractor & Development Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Gadgadawan River (Left Bank), Barangay Barikir, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Sarrat Padsan River Basin, Barangays San Lorenzo and San Miguel, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Dongdong River (Right Bank), Barangay Acnam, Sitio Venus 2, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bislak River, Barangay Cabaruan, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Left Bank), Barangay Cabittauran, Sitio Caduyungan 1, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorMg Samidan ConstContractor (applies to all its work) · contractor Mg Samidan Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Garasgas Creek (Phase I), Brgy. Quiling Norte, Batac City, Ilocos NorteDPWH project · contractor Megapolitan Builders and Const Supply
- C7 · High Concurrent Workload for One ContractorSt Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard ConstContractor (applies to all its work) · contractor St Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bislak River, Brgy. Alsem Sitio Rang-Ay, 0+000-0+824, Vintar, Ilocos NorteDPWH project · contractor Jca Const and Const Supply
- C7 · High Concurrent Workload for One ContractorSt Timothy Const CorpContractor (applies to all its work) · contractor St Timothy Const Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Tengnga, Nueva Era, Ilocos NorteDPWH project · contractor St Timothy Const Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Right Bank), Barangay Sto. NiñO, Sitio Nalibegan 2, Nueva Era, Ilocos NorteDPWH project · contractor St Timothy Const Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bislak River, Brgy. Alsem, 0+000-0+798, Vintar, Ilocos NorteDPWH project · contractor Jca Const and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Barangay Subec, Pagudpud, Ilocos NorteDPWH project · contractor 11-16 Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Mitigation Structure Along Vintar River (Bislak River), Brgy. Canaam, Sitio Canadem, Vintar, Ilocos NorteDPWH project · contractor Asian Pearl Const & Devt Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Mitigation Structure Along Vintar River (Bislak River), Brgy. Alsem, Sitio Namnama, Vintar, Ilocos NorteDPWH project · contractor Jca Const and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Badoc River Barangay Lubigan, Badoc, Ilocos NorteDPWH project · contractor Badoc Builders & Supply Inc Formerly: Badoc Builder & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Baetan 2, Nueva Era, Ilocos NorteDPWH project · contractor Djcm Const Corp Formerly: Djcm Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Dike Along Kabuayan Creek, Burgos, Ilocos NorteDPWH project · contractor Asian Pearl Const & Devt Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Mitigation Structure Along Garasgas Creek, Upstream of Garasgas Bridge, Brgy. Bil-Loca, Batac City, Ilocos NorteDPWH project · contractor Megapolitan Builders and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bislak River, Brgy. San Ramon, 0+000-0+836, Vintar, Ilocos NorteDPWH project · contractor Jca Const and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Lading River (Right Bank), Barangay Cabittauran, Sitio Cabadocan, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Garasgas Creek (Phase Ii), Brgy. Quiling Norte, Batac City, Ilocos NorteDPWH project · contractor Megapolitan Builders and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Barangay Caunayan, Pagudpud, Ilocos NorteDPWH project · contractor 11-16 Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Mitigation Structure Along Garasgas Creek, Downstream of Garasgas Bridge, Brgy. Bil-Loca, Batac City, Ilocos NorteDPWH project · contractor Megapolitan Builders and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Left Bank), Barangay Cabittauran, Sitio Baetan 1, Nueva Era, Ilocos NorteDPWH project · contractor Djcm Const Corp Formerly: Djcm Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Mitigating Structure Along Bislak River, Barangay Canaam, Vintar, Ilocos NorteDPWH project · contractor Asian Pearl Const & Devt Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Revetment Along Tributary of Diappa Creek, Downstream of Diappa Bridge (Phase I), Batac City, Ilocos NorteDPWH project · contractor Megapolitan Builders and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bislak River, Brgy. Canaam, 0+000-0+812, Vintar, Ilocos NorteDPWH project · contractor Asian Pearl Const & Devt Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control On Main Drainage Canal and Tributaries at South of River (Cataban and Caaoacan Section), Laoag City, Ilocos NorteDPWH project · contractor 11-16 Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Badoc River Barangay Balbaldez, Badoc, Ilocos NorteDPWH project · contractor Badoc Builders & Supply Inc Formerly: Badoc Builder & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Sinigpit Creek, Barangay Caray, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorEgb Const Corp Formerly: Egb ConstContractor (applies to all its work) · contractor Egb Const Corp Formerly: Egb Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Badoc River Barangay San Julian, Badoc, Ilocos NorteDPWH project · contractor Badoc Builders & Supply Inc Formerly: Badoc Builder & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Lading River (Left Bank), Barangay Cabittauran, Sitio Namalican 2, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bislak River, Brgy. Alsem Sitio Sadiri, 0+000-0+788, Vintar, Ilocos NorteDPWH project · contractor Jca Const and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Lading River, Barangay Caray, Sitio Lading 2, Nueva Era, Ilocos NorteDPWH project · contractor Djcm Const Corp Formerly: Djcm Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Revetment Along Tributary of Diappa Creek, Downstream of Diappa Bridge (Phase Ii), Batac City, Ilocos NorteDPWH project · contractor Megapolitan Builders and Const Supply
- C5 · Pattern Consistent with Contract SplittingConstruction Offlood Control Structure Along Quiaoit River (Upstream of Nalasin Bridge) Barangay Nalasin, Paoay, Ilocos NorteDPWH project · contractor Badoc Builders & Supply Inc Formerly: Badoc Builder & Supply
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Lading River, Barangay Caray, Sitio Lading 1, Nueva Era, Ilocos NorteDPWH project · contractor Djcm Const Corp Formerly: Djcm Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Baag-Pasaleng, Pagudpud, Ilocos NorteDPWH project · contractor 11-16 Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Left Bank), Barangay Sto. Nino, Sitio Nalibegan 1, Nueva Era, Ilocos NorteDPWH project · contractor St Timothy Const Corp
- C7 · High Concurrent Workload for One ContractorAlpha & Omega Gen Contractor & Development CorpContractor (applies to all its work) · contractor Alpha & Omega Gen Contractor & Development Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Cabittauran River (Right Bank), Barangay Cabittauran, Sitio Caduyungan 2, Nueva Era, Ilocos NorteDPWH project · contractor St Timothy Const Corp
- C7 · High Concurrent Workload for One Contractor11-16 ConstContractor (applies to all its work) · contractor 11-16 Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 1, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorSt Matthew Gen Contractor & Development CorpContractor (applies to all its work) · contractor St Matthew Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorDalcon ConstContractor (applies to all its work) · contractor Dalcon Const
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure Along Lading River (Right Bank), Barangay Cabittauran, Sitio Namalican 1, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorGreat Pacific Builders and Gen Contractor IncContractor (applies to all its work) · contractor Great Pacific Builders and Gen Contractor Inc
- C7 · High Concurrent Workload for One ContractorNorthern BuildersContractor (applies to all its work) · contractor Northern Builders
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan 2, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Nagrebcan, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Seawall Brgy. Poblacion 2, Burayoc, Pagudpud, Ilocos NorteDPWH project · contractor Jlp Const & Supply Formerly: Jlp Construct
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Padsan River, Barangay 17 San Felipe, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Seawall, Barangay Poblacion 2, Burayoc, Pagudpud, Ilocos NorteDPWH project · contractor Jlp Const & Supply Formerly: Jlp Construct
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Inging 2, Nueva Era, Ilocos NorteDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C2 · Awards Very Close to the Budget CeilingConstruction of Slope Protection Structure at Siito Gumamela-Camia, Barangay 27-A, Pungtod, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control at Sitio Sayugen, Barangay Bani, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Mitigating Structure Along Padsan River, Barangay Santo Tomas, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Barangay Buyon and Barangay Pasiocan, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Sitio Kabaywasan, Barangay Bani, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bislak River, Barangay 34, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Mitigating Structure (River Wall Protection Upstream and Downstream), Barangay San Pedro, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Sarrat Padsan River Basin, Barangays San Lorenzo and San Miguel, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Canal Lining, Brgy. 18, San Quirino, Laoag City, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Mitigating Structure (River Wall Protection Upstream and Downstream), Barangay San Juan, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Padsan River, Barangay 17 San Felipe, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bacarra River, Brgy. 1 Santa Rita, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C4 · Schedule / Date InconsistenciesConstruction of Seawall, Barangay Caruan, Pasuquin, Ilocos NorteDPWH project · contractor Hausland Const
- C2 · Awards Very Close to the Budget CeilingRehabilitation of Flood Control Structure at Bislak River, Brgy, San Roque Ii, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingRehabilitation of Flood Control Structure Along Bislak River, Barangay Cabaruan-Casilian, Bacarra, Ilocos Norte (Phase 2)DPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Padsan River, Barangay 18 San Isidro, Sarrat, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Slope Protection, Purok I & Purok Ii, Barangay Pulangi, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bislak River, Barangay Cabaruan, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure, Barangay Teppang, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bislak River, Barangay Casilian to Barangay Cabaruan, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Bacarra River, Brgy. 1 Santa Rita, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Bislak River, Barangay Ganagan-Casilian, Bacarra, Ilocos NorteDPWH project · contractor Zedik Builders
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Bislak River, Barangay Sta. Rita, Bacarra, Ilocos NorteDPWH project · contractor Zedik Builders
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Barangay Buyon and Barangay Pasiocan, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C4 · Schedule / Date InconsistenciesConstruction of Slope Protection Along Abang Bridge (Downstream Side Left Bank), Barangay Lanao, Bangui, Ilocos NorteDPWH project · contractor Tmt Const
- C4 · Schedule / Date InconsistenciesConstruction of Waterway Structure Along Banban River, Barangay Banban and Dadaor, Bangui,Ilocos NorteDPWH project · contractor St Matthew Gen Contractor & Development Corp / Hercules Ventures Inc
- C2 · Awards Very Close to the Budget CeilingRehabilitation of Drainage System, Barangay 3, San Andres Ii, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Along Bislak River, Barangay 1 - Barangay 8, Bacarra, Ilocos NorteDPWH project · contractor Zedik Builders / Megapolitan Builders and Const Supply
- C2 · Awards Very Close to the Budget CeilingRehabilitation of Bank Revetment, Barangay Cabaruan, Bacarra, Ilocos NorteDPWH project · contractor Bjmjb Const & Supply
- A6 · Low-Graded DPWH Contractor Winning DepEd/DOH WorksMartin Development CorpContractor (applies to all its work) · contractor Martin Development Corp
- A6 · Low-Graded DPWH Contractor Winning DepEd/DOH WorksE M Cuerpo IncContractor (applies to all its work) · contractor E M Cuerpo Inc
- A6 · Low-Graded DPWH Contractor Winning DepEd/DOH WorksBusilac Builders IncContractor (applies to all its work) · contractor Busilac Builders Inc
Named parties may reply or request a correction. See the methodology.