131 published flags on records linked to La Union and the LGUs under it. A flag is an automated anomaly that reviewers checked before publishing: a question worth asking, not a finding of wrongdoing.
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Halog East - Halog West, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C3 · Duplicate or Near-Duplicate ProjectsRehabilitation of Baroro River Control, Barangay Dangdangla, San Juan, La UnionDPWH project · contractor My Builders and Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Tanqui-Biday-Carlatan Waterways, San Fernando City, La UnionDPWH project · contractor My Builders and Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Tanqui-Biday-Carlatan Waterways, San Fernando City, La UnionDPWH project · contractor My Builders and Const
- C3 · Duplicate or Near-Duplicate ProjectsRehabilitation of Baroro River Control, Brgy. Dangdangla, San Juan, La UnionDPWH project · contractor My Builders and Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Magsaysay, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Phase 2, Barangay San Jose, Caba, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Barangay Liquicia, Caba, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C1 · Contractor Concentration (Flood Control)Mg Samidan ConstContractor (applies to all its work) · contractor Mg Samidan Const
- C1 · Contractor Concentration (Flood Control)Mg Samidan ConstContractor (applies to all its work) · contractor Mg Samidan Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River Basin, Brgy. Magsaysay, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Mitigation Structure Along Aringay River Basin, Barangay Tavora East, Pugo, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Magsaysay, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Aringay River Basin, Barangay Rizal, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bauang River Basin, Barangay Cabaritan Sur, Naguilian, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C1 · Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor (applies to all its work) · contractor Alpha & Omega Gen Contractor & Development Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River Basin, Brgy. Anduyan, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structures Along Bauang River Basin, Barangay Bato, Naguilian, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Aringay River Basin, Barangay Sta. Teresa, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C1 · Contractor Concentration (Flood Control)Legacy Const Corp Formerly: Legacy ConstContractor (applies to all its work) · contractor Legacy Const Corp Formerly: Legacy Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Mitigation Structures Along Bauang River Basin, Brgy. Acao, Bauang, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Barangay Antonino, Balaoan, La UnionDPWH project · contractor Jmbm Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Aringay River Basin, Brgy. Magsaysay, Tubao, La Union (Package 4)DPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Barangay San Fermin, Caba, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bauang River Basin, Barangay Acao, Bauang, La UnionDPWH project · contractor Pangasinan New Wilson Lumber & Const Supply
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Bauang River Basin, Barangay Dalacdac, Burgos, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Barangay Poblacion Sur, Caba, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure at Brgy. Antonino, Balaoan, La UnionDPWH project · contractor Pagtaengan Builders and Concrete Products
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Phase 1, Barangay San Jose, Caba, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure, Barangay Gana, Caba, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C1 · Contractor Concentration (Flood Control)Alpha & Omega Gen Contractor & Development CorpContractor (applies to all its work) · contractor Alpha & Omega Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorSilverwolves Const CorpContractor (applies to all its work) · contractor Silverwolves Const Corp
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Bauang River Basin, Sta. 0+000 - Sta. 0+900, Brgy. Suguidan Sur, Naguilian, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Aringay River Basin, Barangay Pideg, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Bauang River Basin, Sta. 0+000 - Sta. 0+540, Brgys, Calumbaya and Boy-Utan, Bauang, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Aringay River Basin, Barangay Linapew, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Bauang River Basin, Sta. 0+000 - Sta. 0+900, Brgy. Cabaritan Sur, Naguilian, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Aringay River Basin, Tubao, La Union (Package 8)DPWH project · contractor Rodekom Gen Const and Ent
- C5 · Pattern Consistent with Contract SplittingConstruction of Flood Control Structure Along Bauang River Basin, Sta. 0+000 - Sta. 0+900, Brgy. Natividad, Naguilian, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C7 · High Concurrent Workload for One ContractorSt Timothy Const CorpContractor (applies to all its work) · contractor St Timothy Const Corp
- C7 · High Concurrent Workload for One ContractorSt Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard ConstContractor (applies to all its work) · contractor St Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard Const
- C7 · High Concurrent Workload for One ContractorMg Samidan ConstContractor (applies to all its work) · contractor Mg Samidan Const
- C7 · High Concurrent Workload for One ContractorNorthern BuildersContractor (applies to all its work) · contractor Northern Builders
- C7 · High Concurrent Workload for One ContractorGreat Pacific Builders and Gen Contractor IncContractor (applies to all its work) · contractor Great Pacific Builders and Gen Contractor Inc
- C7 · High Concurrent Workload for One ContractorSt Matthew Gen Contractor & Development CorpContractor (applies to all its work) · contractor St Matthew Gen Contractor & Development Corp
- C7 · High Concurrent Workload for One ContractorAlpha & Omega Gen Contractor & Development CorpContractor (applies to all its work) · contractor Alpha & Omega Gen Contractor & Development Corp
- C1 · Contractor Concentration (Flood Control)Bet Const & SupplyContractor (applies to all its work) · contractor Bet Const & Supply
- C7 · High Concurrent Workload for One ContractorJwu Const and SupplyContractor (applies to all its work) · contractor Jwu Const and Supply
- C7 · High Concurrent Workload for One ContractorLegacy Const Corp Formerly: Legacy ConstContractor (applies to all its work) · contractor Legacy Const Corp Formerly: Legacy Const
- C7 · High Concurrent Workload for One ContractorAnore ConstContractor (applies to all its work) · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsRehabilitation of Flood Mitigation Structure Along Dayacos River, Barangay Bacsayan, San Juan, La UnionDPWH project · contractor J A Olivar Engineering Design Const and S
- C3 · Duplicate or Near-Duplicate ProjectsRehabilitation of Flood Mitigation Structure (Phase 1) Along Dayacos River, Barangay Bacsayan, San Juan, La UnionDPWH project · contractor J A Olivar Engineering Design Const and S
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bauang River Basin, Barangay Sto. Cabaritan Sur, Naguilian, La UnionDPWH project · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River Basin, Brgy. Anduyan, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bauang River Basin (Package 7), Bauang, La UnionDPWH project · contractor Silverwolves Const Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Aringay River Basin, Barangay Leones East, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C1 · Contractor Concentration (Flood Control)Abu ConstContractor (applies to all its work) · contractor Abu Const
- C1 · Contractor Concentration (Flood Control)Cdu ConstContractor (applies to all its work) · contractor Cdu Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Aringay River Basin, Brgy. Magsaysay, Tubao, La Union (Package 4)DPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bauang River Basin, Bauang, La UnionDPWH project · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bauang River Basin, Bauang, La UnionDPWH project · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure, Aringay River Basin, Barangay Rizal, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River Basin, Brgy. Magsaysay, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River Basin, Brgy. Leones East, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River Basin Barangay Halog East, Tubao, La Union (Package 7)DPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bauang River Basin (Package 5), Bauang, La UnionDPWH project · contractor Silverwolves Const Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bauang River Basin (Package 2), Bauang, La UnionDPWH project · contractor Silverwolves Const Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bauang River Basin, Bauang, La UnionDPWH project · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bauang River Basin, Bauang, La UnionDPWH project · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Bauang River Basin (Package 1), Bauang, La UnionDPWH project · contractor Silverwolves Const Corp
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bauang River Basin, Bauang, La UnionDPWH project · contractor Anore Const
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structures Along Bauang River Basin, Barangay Cabaritan Sur, Naguilian, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C3 · Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Baroro River, Barangay Poblacion, San Gabriel, La UnionDPWH project · contractor St Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard Const
- C4 · Schedule / Date InconsistenciesConstruction of Slope Protection Works Along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 810 - Sta. 000 + 900, Sta. 000 + 915- Sta. 000 + 940, Sta. 001 + 190 - Sta. 001 + 220, Sta. 001 + 740 - Sta. 001 + 764DPWH project · contractor Bhm Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin (Package 4), Naguilian, La UnionDPWH project · contractor Universal de Leon Const and Aggregates
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin, Barangays Pudoc to Parian Este, Phase 2, Bauang, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Tubao, La Union (Package 4)DPWH project · contractor Universal de Leon Const and Aggregates
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin (Package 3), Naguilian, La UnionDPWH project · contractor Mg Samidan Const
- C4 · Schedule / Date InconsistenciesConstruction of Flood Mitigation Structure Along Barangay Napaset, Luna, La UnionDPWH project · contractor Alpha & Omega Gen Contractor & Development Corp
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Aringay, La Union (Package 7)DPWH project · contractor Mg Samidan Const
- C4 · Schedule / Date InconsistenciesRehabilitation of Flood Control Structure, Aringay River Basin, Barangay San Antonio, Aringay, La UnionDPWH project · contractor Mg Samidan Const / Kryptonite 6s Builders Inc
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure, Aringay River Basin, Barangay Rizal, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin (Package 6), Naguilian, La UnionDPWH project · contractor Universal de Leon Const and Aggregates
- C4 · Schedule / Date InconsistenciesConstruction of Slope Protection Works Along San Francisco - Ambitacay Road, Sta. 000 + 380 - Sta. 000 + 482, Agoo, La UnionDPWH project · contractor S-Ang Const & Gen Trading Inc
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River Basin, Barangay Linapew, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Baroro River, Barangay Nagsabaran, San Juan, La UnionDPWH project · contractor St Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure, Barangay Concepcion-Tabtabungao, Rosario, La UnionDPWH project · contractor Universal de Leon Const and Aggregates
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Balili River, Barangay Ambaracao Norte, Naguilian, La UnionDPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Balili River, Barangay Aguioas, Naguilian, La UnionDPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Slope Protection Works Along San Francisco - Ambitacay Road, Agoo, La Union Sta. 000 + 650 - Sta. 000 + 710DPWH project · contractor S-Ang Const & Gen Trading Inc
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Aringay, La Union (Package 5)DPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Magsaysay, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River Basin, Barangay Pideg, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure, Barangay Nalasin, Balaoan, La UnionDPWH project · contractor Jmbm Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin (Package 1), Naguilian, La UnionDPWH project · contractor Mg Samidan Const
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure, Barangay Antonino, Balaoan, La UnionDPWH project · contractor Jmbm Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Garcia - Gonzales, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure, Barangay Concepcion-Tabtabungao, Rosario, La UnionDPWH project · contractor Universal de Leon Const and Aggregates
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River Basin, Tubao, La Union (Package 8)DPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Aringay River, Barangay San Juan West, Aringay, La UnionDPWH project · contractor Rock-Wbl Const Corp for: Rock-Wbl Const Trading & Services
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Aringay, La Union (Package 6)DPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin (Package 2), Naguilian, La UnionDPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin, Barangay Cabalayangan, Bauang, La UnionDPWH project · contractor Universal de Leon Const and Aggregates
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Bauang River Basin (Package 5), Naguilian, La UnionDPWH project · contractor Universal de Leon Const and Aggregates
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure, Aringay River Basin, Barangay Leones East, Tubao, La UnionDPWH project · contractor Villar Gen Const and Supplies
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Balili River, Barangay Ambaracao Norte, Naguilian, La UnionDPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Tubao, La Union (Package 6)DPWH project · contractor Universal de Leon Const and Aggregates
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Baroro River, Barangay Bucao, San Gabriel, La UnionDPWH project · contractor St Gerrard Const Gen Contractor & Development Corp Formerly:St Gerrard Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Tubao, La Union (Package 5)DPWH project · contractor Universal de Leon Const and Aggregates
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structures Along Bauang River Basin, Sto Tomas, La UnionDPWH project · contractor High Rock Const and Supplies Inc / Jhi Const & Supply
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Tubao, La Union (Package 2)DPWH project · contractor Mg Samidan Const
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Baroro River, Barangay Bacsil, Bacnotan, LaunionDPWH project · contractor Rodekom Gen Const and Ent
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along the Aringay River Basin, Tubao, La Union (Package 3)DPWH project · contractor Universal de Leon Const and Aggregates
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure Along Bauang River Basin, Barangay Ballay, Bauang, La UnionDPWH project · contractor High Rock Const and Supplies Inc / C T Leoncio Const & Trading
- C2 · Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Aringay River, Barangay Halog East - Halog West, Tubao, La UnionDPWH project · contractor Rodekom Gen Const and Ent
- C4 · Schedule / Date InconsistenciesConstruction of Flood Control Structure at Brgy. Antonino, Balaoan, La UnionDPWH project · contractor Pagtaengan Builders and Concrete Products