Typhoon mode · November 2, 2024 – November 13, 2024

Yinxing (Marce) 2024

5,409 DPWH flood-control projects worth ₱240.31B sit within 277.8 km of this storm’s track. Peak sustained wind 130 kt (241 km/h, 1-minute average). Being on this list says nothing about a project’s quality. It is where photos after the storm are most useful.

Send a check-in photo

Track and projects

Red line: storm centre (best track). Shaded band: 277.8 km around the track (median 34-kt wind radius near the Philippines, or 100 km where radii were not reported). Blue dots: projects with DPWH coordinates.

Projects in path

5,409

Contract value

₱240.31B

Reported complete

4,467

Ongoing or not reported

942

Largest contractors in the path

  1. MG SAMIDAN CONST129 · ₱13.49B
  2. JWU CONST AND SUPPLY121 · ₱11.36B
  3. EGB CONST CORP FORMERLY: EGB CONST122 · ₱7.75B
  4. DALCON CONST82 · ₱7.67B
  5. TOKWING CONST CORP FOR TOKWING CONSTRUC6 · ₱5.02B
  6. MEGAPOLITAN BUILDERS AND CONST SUPPLY104 · ₱4.70B
  7. RAYMAN BUILDERS INC4 · ₱3.79B
  8. VILLAR GEN CONST AND SUPPLIES111 · ₱3.75B
  9. ST TIMOTHY CONST CORP67 · ₱3.63B
  10. V B MANUBAY CONST44 · ₱3.52B

By DPWH implementing office

  1. ISABELA321 · ₱21.77B
  2. Ilocos Norte 1st DEO610 · ₱14.87B
  3. Abra DEO217 · ₱14.15B
  4. Isabela 4th DEO183 · ₱12.51B
  5. Flood Control Management Cluster14 · ₱11.65B
  6. Region I172 · ₱11.01B
  7. Isabela 3rd DEO149 · ₱10.55B
  8. LA UNION153 · ₱10.44B
  9. ILOCOS NORTE194 · ₱9.55B
  10. PANGASINAN161 · ₱8.30B
  11. ABRA105 · ₱7.65B
  12. CAGAYAN157 · ₱6.95B

Satellite before and after

Largest projects in the path with archived imagery. Imagery dates are before and after the contract, not the storm. They are not proof of completion.

Imagery © Esri, Maxar, Earthstar Geographics, and the GIS User Community (World Imagery Wayback).

Projects to check (largest 1,500 of 5,409)

Near one of these? Open the project and use “Check in” to add a dated photo. Faces and plates are blurred automatically.

ProjectPlaceCostStatusContractorkm from track
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RIFlood Control Management Cluster₱1.45BReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC7Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYANFlood Control Management Cluster₱1.10BReported completeRAYMAN BUILDERS INC70Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYANFlood Control Management Cluster₱1.04BReported completeR-II BUILDERS INC71Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYANFlood Control Management Cluster₱945.5MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC100Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱931.7MReported completeRAYMAN BUILDERS INC107Check in
RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYANFlood Control Management Cluster₱907.5MReported completeRAYMAN BUILDERS INC108Check in
REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.9MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC52Check in
REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱862.0MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC49Check in
CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRAFlood Control Management Cluster₱853.1MReported completeRAYMAN BUILDERS INC119Check in
CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱715.1M94% reported progressMSB VITUG CONST69Check in
REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control Management Cluster₱669.3MReported completeE M CUERPO INC52Check in
CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTEFlood Control Management Cluster₱533.8M94% reported progressTOKWING CONST CORP FOR TOKWING CONSTRUC65Check in
CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYANFlood Control Management Cluster₱415.9M90% reported progressJ D LEGASPI CONST94Check in
CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTEFlood Control Management Cluster₱366.6MReported completeTOKWING CONST CORP FOR TOKWING CONSTRUC5Check in
Construction of Casalogan River Control, Casiguran, AuroraCASIGURAN (AURORA), AURORA₱289.5MReported completeDALCON CONST / EGB CONST CORP FORMERLY: EGB CONST247Check in
Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos SurSANTA CATALINA (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST98Check in
Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos SurTAGUDIN (ILOCOS SUR), ILOCOS SUR₱241.2MReported completeA P B CONST / EGB CONST CORP FORMERLY: EGB CONST172Check in
Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos NorteVINTAR (ILOCOS NORTE), ILOCOS NORTE₱211.3MReported completeJOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST33Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B)Region I₱198.0MReported completeALPHA51Check in
BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B)Region I₱198.0M95% reported progressKATHA BUILDERS & SUPPLIES INC51Check in
CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCECordillera Administrative Region₱193.0M90% reported progressBALINTUGAN CONST165Check in
Construction of Flood Mitigation Structure along Sinucalan River, Barangay Camantiles, Urdaneta, PangasinanCITY OF URDANETA (PANGASINAN), PANGASINAN₱193.0MReported completeSILVERWOLVES CONST CORP275Check in
Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos NorteSAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE₱193.0MReported completeBADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST42Check in
Construction of Bulos Flood Control Structure, Dipaculao, AuroraDIPACULAO (AURORA), AURORA₱193.0MReported completeR D TALENS CONST AND TRADING277Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RORegion II₱191.0M88% reported progressR S K M CONST SERVICES163Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAGRegion II₱190.8M93% reported progressEGB CONST CORP FORMERLY: EGB CONST161Check in
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAOCordillera Administrative Region₱190.0M50% reported progressDJY CONST177Check in
OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, AGASIAN, ILAGAN, ISABELA, STA. 000+000-STA. 1+020 (DRegion II₱186.0MReported completeE M CUERPO INC248Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARARegion II₱183.0MReported completeDOUBLE J1908 CONST110Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CARegion II₱182.6M72% reported progressJOMARCANN GEN CONST182Check in
CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTERegion I₱173.0MReported completeBADOC BUILDERS40Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2)Region I₱157.3MReported completeA I P CONST156Check in
Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1)QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR₱157.3MReported completeA I P CONST153Check in
Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnionSAN JUAN (LA UNION), LA UNION₱154.4MReported completeBALINTUGAN CONST197Check in
Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La UnionSAN GABRIEL (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST199Check in
Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnionBACNOTAN (LA UNION), LA UNION₱154.4MReported completeRODEKOM GEN CONST AND ENT193Check in
Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La UnionSAN GABRIEL (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST197Check in
Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La UnionSAN JUAN (LA UNION), LA UNION₱154.4MReported completeST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST199Check in
CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRAAbra DEO₱148.5M92% reported progressMG SAMIDAN CONST106Check in
Construction of Salangsang Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱148.5MReported completeMG SAMIDAN CONST96Check in
CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO DALUPIRIP PROPER, DALUPIRIP, ITOGON, BENGUETCordillera Administrative Region₱147.6M89% reported progressMG SAMIDAN CONST242Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUETCordillera Administrative Region₱147.6M65% reported progressUNIVERSAL DE LEON CONST AND AGGREGATES231Check in
CONSTRUCTION OF SABDANG FLOOD CONTROL ALONG BAUANG RIVER BASIN, POBLACION, SABLAN, BENGUETBenguet 1st DEO₱146.7MReported completeMG SAMIDAN CONST218Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP GRANDE, DAGUPAN CITY, PANGASINANRegion I₱146.6M61% reported progressBET CONST267Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP CHICO, DAGUPAN CITY, PANGASINANRegion I₱146.6M68% reported progressBET CONST267Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNIONRegion I₱146.3M35% reported progressST MATTHEW GEN CONTRACTOR191Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M91% reported progressA I P CONST153Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SURRegion I₱145.1M89% reported progressA I P CONST157Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 6) along Magat River, Santa Lucia Section, Bagabag, Nueva ViscayaBAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST217Check in
Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, KalingaCITY OF TABUK (CAPITAL) (KALINGA), KALINGA₱144.8MReported completeJTM CONST / EGB CONST CORP FORMERLY: EGB CONST128Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, AbraMANABO (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST121Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 8) along Magat River, Baretbet Section, Bagabag, Nueva ViscayaBAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST222Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 2) along Magat River, Magapuy Section, Bayombong, Nueva ViscayaBAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST237Check in
Construction of Pudok Flood Control (Phase 2), Tayum, AbraTAYUM (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST99Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 7) along Magat River, Magapuy Section, Bayombong, Nueva ViscayaBAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST237Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 3) along Magat River, Baretbet Section, Bagabag, Nueva ViscayaBAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST222Check in
Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva ViscayaSOLANO (NUEVA VIZCAYA), NUEVA VIZCAYA₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST232Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, AbraLUBA (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST130Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, AbraLAGANGILANG (ABRA), ABRA₱144.8MReported completeMG SAMIDAN CONST101Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, MANAMTAM SECTION 3, BAMBANG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST242Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, STO. DOMINGO SECTION 4, BAMBANG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST241Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, PAITAN SECTION 1, BAYOMBONG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST235Check in
REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUETCordillera Administrative Region₱144.8MReported completeARCINUE COMM'L CORP248Check in
CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGACordillera Administrative Region₱144.8M93% reported progressOMENGAN CONST127Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, POGONSINO SECTION 5, BAGABAG, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST226Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDC PACKAGE 1) ALONG MAGAT RIVER, BONFAL PROPER SECTION, BAYOMBONG, NUEVA VIZNueva Vizcaya DEO₱144.8MReported completeDALCON CONST233Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG ANGADANAN RIVER, NALUBBUNAN SECTION 2, QUEZON, NUEVA VIZCAYANueva Vizcaya DEO₱144.8MReported completeDALCON CONST232Check in
002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS PACKAGE 4) ALNueva Vizcaya DEO₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST231Check in
002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS PACKAGE 9) ALONGNueva Vizcaya DEO₱144.8MReported completeEGB CONST CORP FORMERLY: EGB CONST230Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRAAbra DEO₱144.8MReported completeMG SAMIDAN CONST99Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLORAbra DEO₱144.8M84% reported progressMG SAMIDAN CONST101Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRAAbra DEO₱144.8MReported completeMG SAMIDAN CONST124Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRAAbra DEO₱144.8M84% reported progressMG SAMIDAN CONST100Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRAAbra DEO₱144.8M87% reported progressMG SAMIDAN CONST129Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG PANGASINAN-NUEVA VISCAYA ROAD, PANGASINANRegion I₱144.7MReported completeE M CUERPO INC269Check in
Construction of Flood Control Structure along Balili River, Barangay Suyo (Package 1), Bagulin, La UnionBAGULIN (LA UNION), LA UNION₱144.7MReported completeMG SAMIDAN CONST / KRYPTONITE 6S BUILDERS INC206Check in
Construction of Flood Control Structure along Aringay River, Barangay San Juan West, Aringay, La UnionARINGAY (LA UNION), LA UNION₱144.7MReported completeROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES226Check in
Construction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT234Check in
Construction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT232Check in
Construction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT233Check in
Construction of Deet-Pudok Flood Control Structure, Tayum, AbraTAYUM (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST99Check in
Construction of Toon-San Gregorio Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱144.7MReported complete739 BUILDERS99Check in
Construction of Naguillan Flood Control Structure, La Paz, AbraLA PAZ (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST / RM30 PSG CONST CORP99Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRAAbra DEO₱144.7M93% reported progressMG SAMIDAN CONST112Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRAAbra DEO₱144.7M95% reported progressMG SAMIDAN CONST112Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM (PACKAGE 2), DAGUPAN CITY, PANGASINANRegion I₱144.7MReported completeHIGH ROCK CONST AND SUPPLIES INC266Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN,Abra DEO₱144.7M93% reported progressMG SAMIDAN CONST103Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNIONRegion I₱144.7M73% reported progressSILVERWOLVES CONST CORP191Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. JARDIN - TARANGOTONG, TAGUDIN, ILOCOS SUR, STA 8+118 - STA 9Region I₱144.7MReported completeGEMMA CONST SUPPLY INC FORMERLY:GEMMA CON169Check in
CONST./REHAB. OF FLOOD MIT. FACI. W/IN MAJOR BASINS & PRIN. RIVERS -CONST. OF FLOOD CONT. STRUC. ALONG ARINGAY RIVER BASIN, TUBAO, LA UNION (PACKAGE 8), TUBAO, LA UNIONLa Union 2nd DEO₱144.7M95% reported progressJWU CONST AND SUPPLY233Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGDARAOAN, SAN FERNANDO CITY, LA UNIONRegion I₱144.7M91% reported progressSILVERWOLVES CONST CORP201Check in
Construction of Magat River Flood Control Project, Barangay Turod, Reina Mercedes, IsabelaREINA MERCEDES (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONST SUPPLY AND POWER DEVELOPMENT176Check in
Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, AbraDOLORES (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST99Check in
Construction of Flood Control Structure along Aringay River, Barangay Rizal, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT233Check in
ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUIsabela 2nd DEO₱144.7MReported completeJWU CONST AND SUPPLY182Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEMIsabela 1st DEO₱144.7MReported completeDRAGON TWELVE BUILDERS122Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PACKAGE 2, GUIBANG,Isabela 3rd DEO₱144.7M94% reported progressJWU CONST AND SUPPLY169Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGANIsabela 3rd DEO₱144.7M90% reported progressJWU CONST AND SUPPLY179Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALITAO FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0+Isabela 4th DEO₱144.7M91% reported progressJWU CONST AND SUPPLY213Check in
OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN SEIsabela 3rd DEO₱144.7M91% reported progressJWU CONST AND SUPPLY178Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTAIsabela 3rd DEO₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES168Check in
OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SECIsabela 3rd DEO₱144.7M86% reported progressROAD EDGE TRADING & DEVELOPMENT SERVICES168Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALITAO FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+Isabela 4th DEO₱144.7MReported completeJWU CONST AND SUPPLY213Check in
Construction of Flood Control Structure along Aringay River, Barangay Samara-Sta.Lucia, Aringay, La UnionARINGAY (LA UNION), LA UNION₱144.7MReported completeSILVERWOLVES CONST CORP227Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0Isabela 4th DEO₱144.7M81% reported progressJWU CONST AND SUPPLY205Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0Isabela 4th DEO₱144.7M73% reported progressJWU CONST AND SUPPLY204Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINABBARAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA.Isabela 4th DEO₱144.7M49% reported progressJWU CONST AND SUPPLY207Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTUREIsabela 1st DEO₱144.7M98% reported progressDRAGON TWELVE BUILDERS163Check in
Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, IsabelaSANTA MARIA (ISABELA), ISABELA₱144.7MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY126Check in
Construction of Flood Control Structure along Aringay River, Barangay Garcia - Gonzales, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT233Check in
Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2REINA MERCEDES (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES176Check in
Construction of Flood Mitigation Structure along Cagayan River, Package 2, Barangay District 2, Gamu, IsabelaGAMU (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES170Check in
Construction of Flood Mitigation Structure along Cagayan River, Package 1, Barangay District 2, Gamu, IsabelaGAMU (ISABELA), ISABELA₱144.7MReported completeROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES169Check in
Construction of Flood Control Structure along Aringay River, Barangay Halog East - Halog West, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT233Check in
Construction of Flood Control Structure along Aringay River, Barangay Anduyan, Tubao, La UnionTUBAO (LA UNION), LA UNION₱144.7MReported completeRODEKOM GEN CONST AND ENT233Check in
Construction of Poblacion-Deet Flood Control along Abra River, Tayum, AbraTAYUM (ABRA), ABRA₱144.7MReported completeMG SAMIDAN CONST / TWINFORMERS CONST SERVICES99Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF COMPANIA FLOOD CONTROL,Isabela 1st DEO₱144.7MReported completeARVEA'S CONST148Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MUDIIT FLOOD CONTROL ALONG ABRA RIVER, MUDIIT, DOLORES, ABRAAbra DEO₱144.6M92% reported progressMG SAMIDAN CONST101Check in
Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 1REINA MERCEDES (ISABELA), ISABELA₱144.5MReported completeA DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST176Check in
FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELAIsabela 4th DEO₱144.4M81% reported progressEDDMARI CONST186Check in
OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. MApayao 2nd DEO₱143.9MReported completeISNAG BUILDERS & DEV'T CORP34Check in
OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S)Apayao 2nd DEO₱143.9M98% reported progressISNAG BUILDERS & DEV'T CORP36Check in
OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S)Apayao 2nd DEO₱143.9MReported completeISNAG BUILDERS & DEV'T CORP34Check in
Construction of Gen. E. Batalla Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 550, Camalaniugan, CagayanCAMALANIUGAN (CAGAYAN), CAGAYAN₱143.9MReported completeGVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO39Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTNueva Vizcaya DEO₱143.3MReported completeDALCON CONST247Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTNueva Vizcaya DEO₱143.3MReported completeDALCON CONST235Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANANueva Vizcaya DEO₱143.3M95% reported progressDALCON CONST231Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTNueva Vizcaya DEO₱143.3MReported completeDALCON CONST221Check in
OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S)Apayao 2nd DEO₱142.9MReported completeISNAG BUILDERS & DEV'T CORP39Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUCAbra DEO₱142.8M96% reported progressMG SAMIDAN CONST109Check in
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOIsabela 4th DEO₱142.6MReported completeEGB CONST CORP FORMERLY: EGB CONST182Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BENAY - BARANGAY PALABOTNueva Vizcaya 2nd DEO₱142.6M72% reported progressAMP 723 CONST CORP FORMERLY: A M P CONST258Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 1, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTEIlocos Norte 2nd DEO₱141.9M75% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY60Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTEIlocos Norte 2nd DEO₱141.9M72% reported progressMEGAPOLITAN BUILDERS AND CONST SUPPLY59Check in
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CASALOGAN FLOOD CONTROL STRUCTURE, CASIGURAN, AURORARegion III₱141.9M69% reported progressDALCON CONST247Check in
OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121Apayao 2nd DEO₱141.8M74% reported progressISNAG BUILDERS & DEV'T CORP43Check in
OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STAApayao 2nd DEO₱141.8M70% reported progressISNAG BUILDERS & DEV'T CORP33Check in
OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S),Apayao 2nd DEO₱141.8M81% reported progressISNAG BUILDERS & DEV'T CORP41Check in
CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BARANGAY STA. ANA, SOLSONA, ILOCOS NORTEIlocos Norte 2nd DEO₱141.4M61% reported progressEUS CONST56Check in
Construction of Catotoran Norte Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0+00 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, CagayanCAMALANIUGAN (CAGAYAN), CAGAYAN₱141.1MReported completeGVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO33Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER,Nueva Vizcaya 2nd DEO₱140.5M94% reported progressDALCON CONST249Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANGA RIVER, BARANGAY MABASA-INABAN, DUPAX DENueva Vizcaya 2nd DEO₱140.5M65% reported progressDALCON CONST252Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 1)Region I₱140.4M82% reported progressRS RODRIGUEZ CONST & SUPPLIES261Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER,Nueva Vizcaya 2nd DEO₱140.4M96% reported progressDALCON CONST252Check in
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTERegion I₱140.4M0% reported progressA B TAYLAN CONST & DEVT FORMERLY: ADSM CONST45Check in
OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (CULLALABO SUR SECTION), BARANGAY CULLALABO, BURGOS, ISABELAIsabela 2nd DEO₱140.4M42% reported progressRR BUILDERS164Check in
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 2)Region I₱140.4M62% reported progressRS RODRIGUEZ CONST & SUPPLIES261Check in
OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (LANTING SECTION), ROXAS,ISABELAIsabela 2nd DEO₱140.4M47% reported progressJWU CONST AND SUPPLY164Check in
OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANQUERO, DOWNSTREAM, PHASE2Isabela 3rd DEO₱140.4M57% reported progressJWU CONST AND SUPPLY176Check in
OO2:FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES DRAINAGE SYSTEMS -CONSTRUCTION OF BUGNAY CREEK FLOOD CONTROL PROJECT, DALIG SECTION, BURGOS, ISABELAIsabela 2nd DEO₱140.4M43% reported progressJWU CONST AND SUPPLY173Check in
OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, RIZAL SECTION, ROXAS, ISABELAIsabela 2nd DEO₱140.4M4% reported progressJWU CONST AND SUPPLY162Check in
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTEIlocos Norte 1st DEO₱140.4M70% reported progressA L SALAZAR CONST INC21Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRAAbra DEO₱140.3M86% reported progressMG SAMIDAN CONST98Check in
Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, IsabelaILAGAN CITY (CAPITAL) (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY160Check in
Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, IsabelaSANTO TOMAS (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY136Check in
Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, IsabelaILAGAN CITY (CAPITAL) (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY161Check in
Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, IsabelaILAGAN CITY (CAPITAL) (ISABELA), ISABELA₱139.9MReported completeEGB CONST CORP FORMERLY: EGB CONST164Check in
Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, IsabelaCABAGAN (ISABELA), ISABELA₱139.9MReported completeDRAGON TWELVE BUILDERS & CONST SUPPLY131Check in
CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788Baguio City DEO₱139.8M97% reported progressGOLDRICH CONST227Check in
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL, LAOAG CITY, ILOCOS NORTEIlocos Norte 1st DEO₱139.0M19% reported progressA B TAYLAN CONST37Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION,Abra DEO₱139.0M90% reported progressMG SAMIDAN CONST95Check in
CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRAAbra DEO₱139.0M95% reported progressMG SAMIDAN CONST99Check in
CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRAAbra DEO₱138.9M85% reported progressMG SAMIDAN CONST95Check in
CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRAAbra DEO₱138.9M95% reported progressMG SAMIDAN CONST93Check in
CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRAAbra DEO₱138.9M96% reported progressMG SAMIDAN CONST97Check in
CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRAAbra DEO₱138.8M21% reported progressMG SAMIDAN CONST121Check in
CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRAAbra DEO₱138.8M80% reported progressMG SAMIDAN CONST108Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF CABARUYAN FLOOD CONTROL, CABARUYAN, DAGUIOMAN, ABRAAbra DEO₱138.7M94% reported progressMG SAMIDAN CONST124Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY LIAbra DEO₱138.5M93% reported progressMG SAMIDAN CONST96Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRAAbra DEO₱138.3MReported completeMG SAMIDAN CONST104Check in
CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRAAbra DEO₱138.2M95% reported progressMG SAMIDAN CONST97Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BAAbra DEO₱138.1M95% reported progress739 BUILDERS108Check in
CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRAAbra DEO₱138.0M40% reported progressMG SAMIDAN CONST105Check in
CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRAAbra DEO₱137.8M95% reported progressMG SAMIDAN CONST98Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF MAGMAGUEY FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱137.7M97% reported progressMG SAMIDAN CONST96Check in
CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRAAbra DEO₱137.7M47% reported progressMG SAMIDAN CONST105Check in
CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRAAbra DEO₱137.6M91% reported progressMG SAMIDAN CONST103Check in
CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRAAbra DEO₱137.6M76% reported progressMG SAMIDAN CONST107Check in
CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRAAbra DEO₱137.6M95% reported progressMG SAMIDAN CONST105Check in
CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRAAbra DEO₱137.6M91% reported progressMG SAMIDAN CONST95Check in
CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRAAbra DEO₱137.6M23% reported progressMG SAMIDAN CONST88Check in
CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRAAbra DEO₱137.6M0% reported progressMG SAMIDAN CONST87Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL ALONG ABRA RIVER, BANGBANGCAG, BUCAY, ABRAAbra DEO₱137.5MReported completeMG SAMIDAN CONST109Check in
CONSTRUCTION OF BAGATOY FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱137.5M89% reported progressMG SAMIDAN CONST95Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY SAN GREGORIO,Abra DEO₱137.5M85% reported progressMG SAMIDAN CONST99Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF LAGAYAN FLOOD CONTROL (PHASE 2), LAGAYAN, ABRAAbra DEO₱137.5M99% reported progressMG SAMIDAN CONST87Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF NAGTUPACAN FLOOD CONTROL ALONG ABRA RIVER, NAGTUPACAN, LAGANGILANG, ABRAAbra DEO₱137.5M90% reported progressMG SAMIDAN CONST106Check in
CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRAAbra DEO₱137.5M75% reported progressMG SAMIDAN CONST97Check in
CONSTRUCTION OF NAGTUPACAN-ISIT FLOOD CONTROL, DOLORES, ABRAAbra DEO₱137.5MReported completeMG SAMIDAN CONST99Check in
REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. ANQUIRAY, AMULUNG, CAGAYAN (DOWNSTREAM) STA. 0+320 - STA. 0+520Cagayan 3rd DEO₱136.4M92% reported progressMEGAY CONST INC FORMERLY: MEGAY CONST86Check in
REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. PATA, ENRILE, CAGAYAN (DOWNSTREAM) STA. 0+230 - STA. 0+430Cagayan 3rd DEO₱136.3M55% reported progressMEGAY CONST INC FORMERLY: MEGAY CONST114Check in
CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRAAbra DEO₱136.2M80% reported progressMG SAMIDAN CONST101Check in
SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI-DAGSIAN FLOOD CONTROL STRUCTURE, LA PAZ, ABRAAbra DEO₱135.9M81% reported progressMG SAMIDAN CONST96Check in
OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY CAAbra DEO₱135.1M84% reported progressMG SAMIDAN CONST93Check in
OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S)Apayao 2nd DEO₱134.4MReported completeISNAG BUILDERS & DEV'T CORP40Check in
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION FACILITIES AT LINGAYEN - BINMALEY, PANGASINANRegion I₱130.1M49% reported progressMSB VITUG CONST263Check in
Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase I)CALASIAO (PANGASINAN), PANGASINAN₱129.6MReported completeARCINUE COMM'L CORP267Check in
Construction of Flood Control Structure along Marang River, Barangay Beti, Aritao, Nueva VizcayaARITAO (NUEVA VIZCAYA), NUEVA VIZCAYA₱129.3MReported completeINDUSTRIAL CONTROLS CORP ICC258Check in
Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase II)CALASIAO (PANGASINAN), PANGASINAN₱128.3MReported completeARCINUE COMM'L CORP268Check in
CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURES (AMBURAYAN RIVER), MINDORO, BANGAR, LA UNIONRegion I₱126.2MReported completeH G LOPEZ CONST173Check in
Share card: Yinxing (Marce) 2024: flood-control projects in its path

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Track: IBTrACS v04r01, NOAA National Centers for Environmental Information (Knapp et al., 2010), including JTWC data. Recent storms use provisional tracks that may change. Local name assigned by PAGASA. Projects: DPWH flood-control project list; distance is from the project’s reported coordinates to the track line.