| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYAN | Flood Control Management Cluster | ₱1.10B | Reported complete | RAYMAN BUILDERS INC | 41 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYAN | Flood Control Management Cluster | ₱1.04B | Reported complete | R-II BUILDERS INC | 40 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Flood Control Management Cluster | ₱945.5M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 12 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱931.7M | Reported complete | RAYMAN BUILDERS INC | 6 | Check in |
| RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱907.5M | Reported complete | RAYMAN BUILDERS INC | 4 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 53 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 56 | Check in |
| CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Flood Control Management Cluster | ₱853.1M | Reported complete | RAYMAN BUILDERS INC | 16 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱715.1M | 94% reported progress | MSB VITUG CONST | 33 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱669.3M | Reported complete | E M CUERPO INC | 53 | Check in |
| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱533.8M | 94% reported progress | TOKWING CONST CORP FOR TOKWING CONSTRUC | 40 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYAN | Flood Control Management Cluster | ₱415.9M | 90% reported progress | J D LEGASPI CONST | 17 | Check in |
| Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | SANTA CATALINA (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 2 | Check in |
| Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos Sur | TAGUDIN (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 73 | Check in |
| Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte | VINTAR (ILOCOS NORTE), ILOCOS NORTE | ₱211.3M | Reported complete | JOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST | 71 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | Reported complete | ALPHA | 51 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | 95% reported progress | KATHA BUILDERS & SUPPLIES INC | 51 | Check in |
| CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | ₱193.0M | 90% reported progress | BALINTUGAN CONST | 57 | Check in |
| Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱193.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 60 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RO | Region II | ₱191.0M | 88% reported progress | R S K M CONST SERVICES | 52 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAG | Region II | ₱190.8M | 93% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 50 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | ₱190.0M | 50% reported progress | DJY CONST | 67 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARA | Region II | ₱183.0M | Reported complete | DOUBLE J1908 CONST | 2 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | ₱182.6M | 72% reported progress | JOMARCANN GEN CONST | 69 | Check in |
| CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE | Region I | ₱173.0M | Reported complete | BADOC BUILDERS | 63 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2) | Region I | ₱157.3M | Reported complete | A I P CONST | 53 | Check in |
| Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1) | QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR | ₱157.3M | Reported complete | A I P CONST | 51 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | BALINTUGAN CONST | 99 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion | BACNOTAN (LA UNION), LA UNION | ₱154.4M | Reported complete | RODEKOM GEN CONST AND ENT | 95 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 99 | Check in |
| CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRA | Abra DEO | ₱148.5M | 92% reported progress | MG SAMIDAN CONST | 2 | Check in |
| Construction of Salangsang Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱148.5M | Reported complete | MG SAMIDAN CONST | 6 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNION | Region I | ₱146.3M | 35% reported progress | ST MATTHEW GEN CONTRACTOR | 92 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 91% reported progress | A I P CONST | 50 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 89% reported progress | A I P CONST | 54 | Check in |
| Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga | CITY OF TABUK (CAPITAL) (KALINGA), KALINGA | ₱144.8M | Reported complete | JTM CONST / EGB CONST CORP FORMERLY: EGB CONST | 17 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra | MANABO (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 17 | Check in |
| Construction of Pudok Flood Control (Phase 2), Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 4 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra | LUBA (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 27 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, Abra | LAGANGILANG (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 3 | Check in |
| CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGA | Cordillera Administrative Region | ₱144.8M | 93% reported progress | OMENGAN CONST | 17 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 3 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLOR | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 3 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 17 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRA | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 2 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRA | Abra DEO | ₱144.8M | 87% reported progress | MG SAMIDAN CONST | 26 | Check in |
| Construction of Deet-Pudok Flood Control Structure, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 4 | Check in |
| Construction of Toon-San Gregorio Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | 739 BUILDERS | 4 | Check in |
| Construction of Naguillan Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / RM30 PSG CONST CORP | 4 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRA | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 6 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRA | Abra DEO | ₱144.7M | 95% reported progress | MG SAMIDAN CONST | 8 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN, | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 1 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | ₱144.7M | 73% reported progress | SILVERWOLVES CONST CORP | 93 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. JARDIN - TARANGOTONG, TAGUDIN, ILOCOS SUR, STA 8+118 - STA 9 | Region I | ₱144.7M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 70 | Check in |
| Construction of Magat River Flood Control Project, Barangay Turod, Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONST SUPPLY AND POWER DEVELOPMENT | 63 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, Abra | DOLORES (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 5 | Check in |
| ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRU | Isabela 2nd DEO | ₱144.7M | Reported complete | JWU CONST AND SUPPLY | 71 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEM | Isabela 1st DEO | ₱144.7M | Reported complete | DRAGON TWELVE BUILDERS | 10 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PACKAGE 2, GUIBANG, | Isabela 3rd DEO | ₱144.7M | 94% reported progress | JWU CONST AND SUPPLY | 57 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN | Isabela 3rd DEO | ₱144.7M | 90% reported progress | JWU CONST AND SUPPLY | 66 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN SE | Isabela 3rd DEO | ₱144.7M | 91% reported progress | JWU CONST AND SUPPLY | 66 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTA | Isabela 3rd DEO | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 55 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC | Isabela 3rd DEO | ₱144.7M | 86% reported progress | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 55 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0 | Isabela 4th DEO | ₱144.7M | 81% reported progress | JWU CONST AND SUPPLY | 93 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0 | Isabela 4th DEO | ₱144.7M | 73% reported progress | JWU CONST AND SUPPLY | 93 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINABBARAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. | Isabela 4th DEO | ₱144.7M | 49% reported progress | JWU CONST AND SUPPLY | 94 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE | Isabela 1st DEO | ₱144.7M | 98% reported progress | DRAGON TWELVE BUILDERS | 50 | Check in |
| Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela | SANTA MARIA (ISABELA), ISABELA | ₱144.7M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 14 | Check in |
| Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2 | REINA MERCEDES (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 63 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, Package 2, Barangay District 2, Gamu, Isabela | GAMU (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES | 58 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, Package 1, Barangay District 2, Gamu, Isabela | GAMU (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES | 57 | Check in |
| Construction of Poblacion-Deet Flood Control along Abra River, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / TWINFORMERS CONST SERVICES | 4 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF COMPANIA FLOOD CONTROL, | Isabela 1st DEO | ₱144.7M | Reported complete | ARVEA'S CONST | 35 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MUDIIT FLOOD CONTROL ALONG ABRA RIVER, MUDIIT, DOLORES, ABRA | Abra DEO | ₱144.6M | 92% reported progress | MG SAMIDAN CONST | 3 | Check in |
| Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 1 | REINA MERCEDES (ISABELA), ISABELA | ₱144.5M | Reported complete | A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST | 63 | Check in |
| FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Isabela 4th DEO | ₱144.4M | 81% reported progress | EDDMARI CONST | 74 | Check in |
| OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Apayao 2nd DEO | ₱143.9M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 76 | Check in |
| OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Apayao 2nd DEO | ₱143.9M | 98% reported progress | ISNAG BUILDERS & DEV'T CORP | 75 | Check in |
| OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Apayao 2nd DEO | ₱143.9M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 76 | Check in |
| Construction of Gen. E. Batalla Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 550, Camalaniugan, Cagayan | CAMALANIUGAN (CAGAYAN), CAGAYAN | ₱143.9M | Reported complete | GVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO | 72 | Check in |
| OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Apayao 2nd DEO | ₱142.9M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 71 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUC | Abra DEO | ₱142.8M | 96% reported progress | MG SAMIDAN CONST | 5 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION WORKS FO | Isabela 4th DEO | ₱142.6M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 69 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 1, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.9M | 75% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 42 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.9M | 72% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 43 | Check in |
| OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Apayao 2nd DEO | ₱141.8M | 74% reported progress | ISNAG BUILDERS & DEV'T CORP | 67 | Check in |
| OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Apayao 2nd DEO | ₱141.8M | 70% reported progress | ISNAG BUILDERS & DEV'T CORP | 78 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Apayao 2nd DEO | ₱141.8M | 81% reported progress | ISNAG BUILDERS & DEV'T CORP | 70 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BARANGAY STA. ANA, SOLSONA, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.4M | 61% reported progress | EUS CONST | 50 | Check in |
| Construction of Catotoran Norte Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0+00 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, Cagayan | CAMALANIUGAN (CAGAYAN), CAGAYAN | ₱141.1M | Reported complete | GVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO | 78 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTE | Region I | ₱140.4M | 0% reported progress | A B TAYLAN CONST & DEVT FORMERLY: ADSM CONST | 58 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (CULLALABO SUR SECTION), BARANGAY CULLALABO, BURGOS, ISABELA | Isabela 2nd DEO | ₱140.4M | 42% reported progress | RR BUILDERS | 52 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (LANTING SECTION), ROXAS,ISABELA | Isabela 2nd DEO | ₱140.4M | 47% reported progress | JWU CONST AND SUPPLY | 53 | Check in |
| OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANQUERO, DOWNSTREAM, PHASE2 | Isabela 3rd DEO | ₱140.4M | 57% reported progress | JWU CONST AND SUPPLY | 63 | Check in |
| OO2:FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES DRAINAGE SYSTEMS -CONSTRUCTION OF BUGNAY CREEK FLOOD CONTROL PROJECT, DALIG SECTION, BURGOS, ISABELA | Isabela 2nd DEO | ₱140.4M | 43% reported progress | JWU CONST AND SUPPLY | 61 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, RIZAL SECTION, ROXAS, ISABELA | Isabela 2nd DEO | ₱140.4M | 4% reported progress | JWU CONST AND SUPPLY | 51 | Check in |
| FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱140.4M | 70% reported progress | A L SALAZAR CONST INC | 82 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRA | Abra DEO | ₱140.3M | 86% reported progress | MG SAMIDAN CONST | 6 | Check in |
| Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 49 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, Isabela | SANTO TOMAS (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 23 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 48 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 52 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, Isabela | CABAGAN (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 18 | Check in |
| FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL, LAOAG CITY, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱139.0M | 19% reported progress | A B TAYLAN CONST | 66 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION, | Abra DEO | ₱139.0M | 90% reported progress | MG SAMIDAN CONST | 9 | Check in |
| CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | ₱139.0M | 95% reported progress | MG SAMIDAN CONST | 4 | Check in |
| CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRA | Abra DEO | ₱138.9M | 85% reported progress | MG SAMIDAN CONST | 10 | Check in |
| CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Abra DEO | ₱138.9M | 95% reported progress | MG SAMIDAN CONST | 10 | Check in |
| CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Abra DEO | ₱138.9M | 96% reported progress | MG SAMIDAN CONST | 7 | Check in |
| CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Abra DEO | ₱138.8M | 21% reported progress | MG SAMIDAN CONST | 17 | Check in |
| CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA | Abra DEO | ₱138.8M | 80% reported progress | MG SAMIDAN CONST | 1 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF CABARUYAN FLOOD CONTROL, CABARUYAN, DAGUIOMAN, ABRA | Abra DEO | ₱138.7M | 94% reported progress | MG SAMIDAN CONST | 17 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY LI | Abra DEO | ₱138.5M | 93% reported progress | MG SAMIDAN CONST | 6 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRA | Abra DEO | ₱138.3M | Reported complete | MG SAMIDAN CONST | 2 | Check in |
| CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Abra DEO | ₱138.2M | 95% reported progress | MG SAMIDAN CONST | 6 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Abra DEO | ₱138.1M | 95% reported progress | 739 BUILDERS | 4 | Check in |
| CONSTRUCTION OF LIPCAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY LIPCAN, BANGUED, ABRA | Abra DEO | ₱138.0M | 40% reported progress | MG SAMIDAN CONST | 3 | Check in |
| CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | ₱137.8M | 95% reported progress | MG SAMIDAN CONST | 4 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF MAGMAGUEY FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱137.7M | 97% reported progress | MG SAMIDAN CONST | 8 | Check in |
| CONSTRUCTION OF AGTANGAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGTANGAO, BANGUED, ABRA | Abra DEO | ₱137.7M | 47% reported progress | MG SAMIDAN CONST | 3 | Check in |
| CONSTRUCTION OF AGUET FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY AGUET, LAGANGILANG, ABRA | Abra DEO | ₱137.6M | 91% reported progress | MG SAMIDAN CONST | 1 | Check in |
| CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CALAO, BUCAY, ABRA | Abra DEO | ₱137.6M | 76% reported progress | MG SAMIDAN CONST | 3 | Check in |
| CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRA | Abra DEO | ₱137.6M | 95% reported progress | MG SAMIDAN CONST | 3 | Check in |
| CONSTRUCTION OF DAOIDAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY DAOIDAO, SAN JUAN, ABRA | Abra DEO | ₱137.6M | 91% reported progress | MG SAMIDAN CONST | 9 | Check in |
| CONSTRUCTION OF PANG-OT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY PANG-OT, LAGAYAN, ABRA | Abra DEO | ₱137.6M | 23% reported progress | MG SAMIDAN CONST | 17 | Check in |
| CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRA | Abra DEO | ₱137.6M | 0% reported progress | MG SAMIDAN CONST | 17 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL ALONG ABRA RIVER, BANGBANGCAG, BUCAY, ABRA | Abra DEO | ₱137.5M | Reported complete | MG SAMIDAN CONST | 5 | Check in |
| CONSTRUCTION OF BAGATOY FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱137.5M | 89% reported progress | MG SAMIDAN CONST | 9 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY SAN GREGORIO, | Abra DEO | ₱137.5M | 85% reported progress | MG SAMIDAN CONST | 4 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF LAGAYAN FLOOD CONTROL (PHASE 2), LAGAYAN, ABRA | Abra DEO | ₱137.5M | 99% reported progress | MG SAMIDAN CONST | 17 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF NAGTUPACAN FLOOD CONTROL ALONG ABRA RIVER, NAGTUPACAN, LAGANGILANG, ABRA | Abra DEO | ₱137.5M | 90% reported progress | MG SAMIDAN CONST | 2 | Check in |
| CONSTRUCTION OF SAGAP FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY SAGAP, BANGUED, ABRA | Abra DEO | ₱137.5M | 75% reported progress | MG SAMIDAN CONST | 5 | Check in |
| CONSTRUCTION OF NAGTUPACAN-ISIT FLOOD CONTROL, DOLORES, ABRA | Abra DEO | ₱137.5M | Reported complete | MG SAMIDAN CONST | 4 | Check in |
| REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. ANQUIRAY, AMULUNG, CAGAYAN (DOWNSTREAM) STA. 0+320 - STA. 0+520 | Cagayan 3rd DEO | ₱136.4M | 92% reported progress | MEGAY CONST INC FORMERLY: MEGAY CONST | 26 | Check in |
| REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CAGAYAN RIVER FLOOD MANAGEMENT PROJECTS, BRGY. PATA, ENRILE, CAGAYAN (DOWNSTREAM) STA. 0+230 - STA. 0+430 | Cagayan 3rd DEO | ₱136.3M | 55% reported progress | MEGAY CONST INC FORMERLY: MEGAY CONST | 3 | Check in |
| CONSTRUCTION OF LACUB FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LACUB, ABRA | Abra DEO | ₱136.2M | 80% reported progress | MG SAMIDAN CONST | 7 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF PATAGUI-DAGSIAN FLOOD CONTROL STRUCTURE, LA PAZ, ABRA | Abra DEO | ₱135.9M | 81% reported progress | MG SAMIDAN CONST | 7 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY CA | Abra DEO | ₱135.1M | 84% reported progress | MG SAMIDAN CONST | 10 | Check in |
| OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Apayao 2nd DEO | ₱134.4M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 70 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURES (AMBURAYAN RIVER), MINDORO, BANGAR, LA UNION | Region I | ₱126.2M | Reported complete | H G LOPEZ CONST | 74 | Check in |
| Rehabilitation of Flood Control Structure On Scoured and Eroded River Bank along Badoc River, barangay Las-ud and San Julian, Badoc, Ilocos Norte | BADOC (ILOCOS NORTE), ILOCOS NORTE | ₱125.4M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 37 | Check in |
| 25PJ0029: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 26 +900 - STA. 28+200 (R/S), BUSILAC, ALFONSO LISTA, IFUGAO | Ifugao 2nd DEO | ₱123.5M | 78% reported progress | DJY CONST | 74 | Check in |
| CLUSTER: 1. CONSTRUCTION OF SAN JUAN FLOOD CONTROL, STA. 38+023 - STA. 38+792 (LS) 2. CONSTRUCTION OF CALUPAAN FLOOD CONTROL, STA. 40+975 - STA. 41+668 (LS), 3. CONSTRUCTION OF CALIMAG FLOOD CONTROL, STA. 5+823 - STA. 6+132, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | ₱123.5M | Reported complete | DJY CONST | 80 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, BARANGAY MABALENG, BATAC CITY, ILOCOS NORTE | Region I | ₱122.7M | 75% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 45 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM - CONST'N/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONST'N OF MAGAT RIVER FLOOD MNG'T, SAN ROQUE, SAN MATEO, ISABELA | Region II | ₱121.9M | Reported complete | J H PAJARA CONST CORP | 76 | Check in |
| Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 37+995 - Sta. 39+300 (R/S), Conner, Apayao | CONNER (APAYAO), APAYAO | ₱115.8M | Reported complete | JOMARCANN GEN CONST / RODEKOM GEN CONST AND ENT | 24 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, BATAC CITY, ILOCOS NORTE | Region I | ₱115.8M | Reported complete | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 50 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAOIT RIVER DIVERSION CANAL, PAOAY, ILOCOS NORTE | Region I | ₱115.8M | Reported complete | RCD GEN CONTRACTOR & CONST SUPPLY | 50 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. BIO-BUCAO - EAST BUCAO - WEST-SAN MIGUEL, TAGUDIN, ILOCOS SU | Region I | ₱115.8M | Reported complete | A P B CONST | 74 | Check in |
| Construction of Gen. E. Batalla Flood Control System, Camalaniugan, Cagayan | CAMALANIUGAN (CAGAYAN), CAGAYAN | ₱114.6M | Reported complete | GVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO | 72 | Check in |
| OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEMS (UPSTREAM), SAN PABLO ISABELA | Region II | ₱114.4M | 89% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 6 | Check in |
| LOCAL PROGRAM: FLOOD CONTROL AND DRAINAGE/FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ARCON FLOOD CONTROL SYSTEM, PHASE II | Region II | ₱112.9M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 33 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF SWIP, BARANGAY CAMANDINGAN, CITY OF BATAC, ILOCOS NORTE | Region I | ₱112.3M | 0% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 53 | Check in |
| DISASTER-RELATED AND EMERGENCY REHABILITATION - FLOOD CONTROL SYSTEMS 1.) RECOVERY/RECONSTRUCTION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA 2.) REPAIR/REHABILITATION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA | Cordillera Administrative Region | ₱112.3M | 26% reported progress | S D PLATON CONST INC | 7 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, BARANGAY PANTAY AND BARANGAY TAMURONG, CAOAYAN, ILOCOS SUR | Ilocos Sur 1st DEO | ₱112.3M | 95% reported progress | 739 BUILDERS | 13 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG SOLSONA RIVER, SOLSONA, ILOCOS NORTE | Region I | ₱112.3M | 49% reported progress | A B TAYLAN CONST & DEVT FORMERLY: ADSM CONST | 53 | Check in |
| SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RIVERBANK PROTECTION AT NANGUNEG WEST AND SAN PEDRO, NARVACAN, ILOCOS SUR | Ilocos Sur 2nd DEO | ₱112.3M | 60% reported progress | SATRAP CONST CO INC | 21 | Check in |
| Construction of Balug Flood Control at Tumauini, Isabela | TUMAUINI (ISABELA), ISABELA | ₱109.1M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 36 | Check in |
| ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE | Apayao 1st DEO | ₱108.8M | 87% reported progress | OMENGAN CONST | 46 | Check in |
| Construction of Carpentero-Compania Flood Control Phase II, Tumauini, Isabela | TUMAUINI (ISABELA), ISABELA | ₱108.7M | Reported complete | ARVEA'S CONST / EGB CONST CORP FORMERLY: EGB CONST | 35 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF CAPO FLOOD CONTROL SYSTEM, ILAGAN CITY, ISABELA | Region II | ₱108.4M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 45 | Check in |
| Construction of Flood Control Structure along Quiaoit River (Upstream of Barsa Bridge), Sitio Barsa, barangay Nalasin, Paoay, Ilocos Norte | PAOAY (ILOCOS NORTE), ILOCOS NORTE | ₱106.1M | Reported complete | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 53 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG MADONGAN RIVER, NUEVA ERA, ILOCOS NORTE | Region I | ₱106.1M | 67% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 45 | Check in |
| Construction of Flood Control System along Abra River Upstream and Downstream of Calungbuyan Bridge, Santa, Ilocos Sur | SANTA (ILOCOS SUR), ILOCOS SUR | ₱104.2M | Reported complete | BET CONST & SUPPLY / M G LUALHATI CONST CORP | 9 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CATOTORAN SUR FLOOD CONTROL STRUCTURE, CAMALANIUGAN CAGAYAN | Region II | ₱102.8M | Reported complete | R A PAHATI CONST & SUPPLY INC | 77 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE A | Isabela 1st DEO | ₱101.3M | 85% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 50 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Isabela 1st DEO | ₱101.3M | 73% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 49 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Isabela 1st DEO | ₱101.3M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 17 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-RIVER BANK PROTECTION FOR LOWER CAGAYAN RIVER, TUMAUINI, ISABELA (UPSTREAM) | Region II | ₱100.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 35 | Check in |
| Rehabilitation of Flood Control along Galpac Creek, Paoay, Ilocos Norte | PAOAY (ILOCOS NORTE), ILOCOS NORTE | ₱99.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY | 49 | Check in |
| Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 2), Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱99.0M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 64 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE PATANAD SECTION 2, SAN ISIDRO, ISABELA | Isabela 4th DEO | ₱99.0M | 96% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 94 | Check in |
| Construction of Cagayan River Flood Control Project, Bgy. District 1 (Package 1), Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱99.0M | Reported complete | MAR-DEB CONST & DEVELOPMENT CORP FORMERLY: MAR-DEB CONST & DEVELOPMENT | 64 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA | Isabela 3rd DEO | ₱99.0M | Reported complete | MAR-DEB CONST | 65 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BRGY. BANQUERO, REINA MERCEDES, ISABELA | Isabela 3rd DEO | ₱99.0M | Reported complete | MAR-DEB CONST | 63 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION (CONTINUATION) OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. DISTRICT I, REINA MERCEDES, | Isabela 3rd DEO | ₱99.0M | Reported complete | MAR-DEB CONST | 66 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. ROXAS (STA. 0+000 - STA. 0+510) NAGUILIAN, ISABELA | Isabela 3rd DEO | ₱99.0M | 96% reported progress | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 61 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG ABRA RIVER, BANTAY SECTION, PHASE II, BANTAY, ILOCOS SUR | Region I | ₱98.3M | Reported complete | A P B CONST | 2 | Check in |
| Construction of Mapacopaco Flood Control, Sta. 38+850 - Sta. 39+900 (R/S), Posnaan, Aguinaldo, Ifugao | AGUINALDO (IFUGAO), IFUGAO | ₱98.0M | Reported complete | MA CONST / R S SEPIAN CONST & TRUCKING | 74 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BRGY. CANAAM, VINTAR, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱98.0M | Reported complete | NORTH TECH BUILDERS AND CONST SUPPLY | 78 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BRGY. CABAYO, VINTAR, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱98.0M | Reported complete | MG SAMIDAN CONST | 87 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BAYUDAN-CHICO RIVER FLOOD-EROSION CONTROL PROJECT | Cordillera Administrative Region | ₱97.5M | Reported complete | FIAT CONST SERVICES | 66 | Check in |
| Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Right Bank, barangay Maruaya, Piddig, Ilocos Norte | PIDDIG (ILOCOS NORTE), ILOCOS NORTE | ₱97.5M | Reported complete | MGB CONST & TRADING | 66 | Check in |
| Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Left Bank, barangay Calambeg, Piddig, Ilocos Norte | PIDDIG (ILOCOS NORTE), ILOCOS NORTE | ₱97.5M | Reported complete | NORTH TECH BUILDERS AND CONST SUPPLY / SOLID NORTH CONST | 67 | Check in |
| Construction of Flood Mitigation Structure along Laoag River Basin, Dingris River, Left Bank, barangay Maruaya, Piddig, Ilocos Norte | PIDDIG (ILOCOS NORTE), ILOCOS NORTE | ₱97.5M | Reported complete | MGB CONST & TRADING | 66 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG), SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCT | Apayao 1st DEO | ₱96.7M | Reported complete | JOMARCANN GEN CONST | 18 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banglolao - Labon, Bucay, Abra | BUCAY (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 7 | Check in |
| Construction of Canayun-Sirit-Dana-Ili Flood Control along Abulug River (Sta. 13+300 - Sta. 13+580) left side, Abulug, Cagayan | ABULUG (CAGAYAN), CAGAYAN | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 91 | Check in |
| Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 10 + 451 - 10 + 888 (L.S), Sta. 10 + 506 - 10 + 689 (RS), Sta. 10 + 917 - 11 + 039 (L.S), Sta.
0 + 000 - 0 + 056 (L.S), Sta. 0 + 000 - 0 + 075 (RS) and Sta.
11 + 152 - 11 + 392 (LS), Buguias, Benguet | BUGUIAS (BENGUET), BENGUET | ₱96.5M | Reported complete | MG SAMIDAN CONST / GELLE CONST SERVICES | 96 | Check in |
| Construction of Lias Flood Control Structure (Section 1L), Sta. 055+825 - Sta. 056+700 (Right Side), Barlig, Mountain Province | BARLIG (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE | ₱96.5M | Reported complete | E T LATAWAN CONST | 57 | Check in |
| Construction of Flood Control Structure, Barangay Cardona, Dolores, Abra | DOLORES (ABRA), ABRA | ₱96.5M | Reported complete | ST TIMOTHY CONST CORP | 8 | Check in |
| Reconstruction of Canayun-Sirit-Dana-ili Flood Control Along Abulug River , Abulug, Cagayan Sta. 12+700 - Sta. 12+860, Sta. 13+220 - Sta. 13+300 (L/S) | CAGAYAN | ₱96.5M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 91 | Check in |
| Construction of Baybayatin Flood Control, Lagayan, Abra | LAGAYAN (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 19 | Check in |
| Construction of Guyabal Flood Control Project, Guyabal, Cauayan City, Isabela | CITY OF CAUAYAN (ISABELA), ISABELA | ₱96.5M | Reported complete | MA TESORO CONST / EGB CONST CORP FORMERLY: EGB CONST | 72 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin (Phase II), Banacao, Bangued, Abra | BANGUED (CAPITAL) (ABRA), ABRA | ₱96.5M | Reported complete | MG SAMIDAN CONST | 2 | Check in |
| Construction of Flood Control Structure along Bayudan River, Kabulawan-Busilac Bila-Otucan Sur, Sta. 55+800 - Sta. 56+480 (B.S.), Bauko, Mountain Province | BAUKO (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE | ₱96.5M | Reported complete | MG SAMIDAN CONST / R S SEPIAN CONST & TRUCKING | 67 | Check in |
| Construction of Seawall along the Shoreline of Ballesteros, Cagayan | BALLESTEROS (CAGAYAN), CAGAYAN | ₱96.5M | Reported complete | TJMT CONST / JEICCA BUILDERS | 89 | Check in |
| Construction of Buringal Proper Flood Control (Sulinek Section), Sta. 065+507 - Sta. 066+407 (Right Side), Buringal, Paracelis, Mountain Province | PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE | ₱96.5M | Reported complete | UPLAND CONST AND ENGINEERING SERVICES | 44 | Check in |
| Construction of Flood Control Structure along Apayao River Basin, Namaltugan Section, Calanasan, Apayao | CALANASAN (BAYAG) (APAYAO), APAYAO | ₱96.5M | Reported complete | TAGEL CORP / E C V CONST | 59 | Check in |
| Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet | BENGUET | ₱96.5M | Reported complete | RODEKOM GEN CONST AND ENT | 75 | Check in |